Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Ladakh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Ladakh
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Ladakh at a glance for solar projects
| Electricity regulator | Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh (JERC) |
|---|---|
| State renewable energy agency | Ladakh Renewable Energy Development Agency (LREDA) |
| Electricity distribution | LPDD (The whole Union Territory of Ladakh, including Leh and Kargil) |
| State solar policy | No notified Ladakh solar policy found; a broader policy was proposed in April 2026 |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing above 500 kW up to 1 MW |
Net metering for a house in Ladakh
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Ladakh
JERC's Grid Interactive Renewable Energy System regulations, 2023 cover both Union Territories, so the same rules apply in Ladakh as in Jammu and Kashmir. Eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The regulations were notified on 29 May 2023 and amended once, on 28 June 2024.
- Gross metering is also allowed up to 1 MW. A consumer may use only one of the three arrangements in the same premises.
- The plant may not be larger than the sanctioned load (kW) or the contract demand (kVA). The licensee may consider a net metering plant above 500 kW if its network stays stable.
- A plant above 1 MW under net billing or gross metering needs load flow studies that show no adverse effect on the grid.
- The total capacity under net metering and net billing connected to one distribution transformer or feeder may go up to 100% of its rated capacity.
- Group net metering is open to all consumers for systems of 5 kW to 500 kW. Virtual net metering is only for residential consumers, group housing societies and government or local authority establishments.
- Under net metering, surplus units carry forward as credit. Credit left at the end of the financial year is bought by the licensee at the lower of its average power purchase cost and the feed-in tariff, and paid by 31 May of the next year.
- Under net billing, the surplus is sold to the licensee at the feed-in tariff approved by the Commission. Imports are charged under the tariff order.
- Consumers with arrears are not eligible.
- The First Amendment of 28 June 2024 changed the process. Complete applications up to 10 kW are deemed accepted without a feasibility study. For systems above 10 kW the licensee has 15 days for the study, or the proposal is presumed feasible. After the installation certificate the licensee has 15 days to sign the agreement, fit the meter and commission.
Subsidy for houses in Ladakh
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Ladakh.
Questions about solar projects in Ladakh
Is net metering available for factories and commercial buildings in Ladakh?
JERC's Grid Interactive Renewable Energy System regulations, 2023 cover both Union Territories, so the same rules apply in Ladakh as in Jammu and Kashmir. Eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The regulations were notified on 29 May 2023 and amended once, on 28 June 2024.
How much solar subsidy can a house in Ladakh get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Ladakh?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Ladakh?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ladakh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Administration of UT Ladakh news item of 8 April 2026; Power Development document list on ladakh.gov.in
- Draft State Energy Efficiency Action Plan for Ladakh (Ministry of Power, June 2023, hosted on the Ladakh Power Development Department site): LREDA is the nodal agency for MNRE programmes in Ladakh; the Kargil Renewable Energy Development Agency (KREDA) is the nodal agency for renewable energy projects in Kargil
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- JERC (Grid Interactive Renewable Energy system and its related matters) Regulations, 2023, notified 29 May 2023 (Gazette of 12 June 2023; regulation 1.3 extends them to Ladakh), and First Amendment Regulations, 2024, notified 28 June 2024; JERC order No. 05 of 2026 dated 18 August 2026 (para 3.19)
- JERC tariff order No. 05 of 2026 for the Ladakh Power Development Department, dated 18 August 2026, cover page and para 1
- Ladakh Power Development Department website, About Us (LPDD is the only power distribution utility in the UT); JERC tariff order No. 05 of 2026 dated 18 August 2026
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ