Somaya Solar Solutions Limited builds ground-mounted solar power plants in Ladakh for businesses that want their own power and for landowners and developers who sell power to the grid.
State policy and open access in Ladakh
We could not find a notified Ladakh solar policy as of November 2026. On 7 April 2026 the Chief Engineer of the Power Development Department said proposals for a broader solar policy had been placed before the competent authority. Rooftop solar falls under the 2023 regulations of the Joint Electricity Regulatory Commission for Jammu & Kashmir and Ladakh. National schemes (PM Surya Ghar for homes, PM-KUSUM for farmers) apply.
- The Power Development Department's document list on ladakh.gov.in (updated 16 November 2026) shows only a draft rooftop scheme for commercial consumers, open for comments on 6 June 2025.
JERC's Green Energy Open Access Regulations, 2024 (notified on 12 February 2024) extend to the whole of Ladakh as well as Jammu and Kashmir. A consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or on several in the same electricity division, can take green energy through open access. A captive consumer has no load limit.
- Banking is on a monthly basis. The banking charge is 8% of the energy banked, taken in kind. The permitted banked energy is at least 30% of the consumer's monthly consumption from the licensee.
- The regulations say the cross-subsidy surcharge is set in the retail supply tariff order and is not levied when open access carries power from a person's own captive plant to the place of use. The 2026-27 order for the Ladakh Power Development Department does not set a surcharge or wheeling charge figure.
What a ground-mounted project involves
A ground-mounted plant needs more groundwork than a rooftop one before any module is fixed.
- Land check: title, slope, soil, drainage, access road and shading
- Distance to the substation or connection point and the line needed to reach it
- Layout, structure design and foundations for the soil
- Supply, installation, testing and commissioning
- Evacuation line, metering and connection approvals
- Fencing, cleaning water and maintenance planning
More detail: Ground-Mounted Solar Plant across India.
Questions about solar projects in Ladakh
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ladakh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 19 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.