Somaya Solar Solutions Limited is a solar EPC company that takes up rooftop and ground-mounted projects in Ladakh. EPC means one contractor does the engineering, buys the equipment, builds the plant and hands it over working.
Ladakh at a glance for solar projects
| Electricity regulator | Joint Electricity Regulatory Commission for the UT of Jammu & Kashmir and the UT of Ladakh (JERC) |
|---|---|
| State renewable energy agency | Ladakh Renewable Energy Development Agency (LREDA) |
| Electricity distribution | LPDD (The whole Union Territory of Ladakh, including Leh and Kargil) |
| State solar policy | No notified Ladakh solar policy found; a broader policy was proposed in April 2026 |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing above 500 kW up to 1 MW |
What our EPC scope covers
An EPC contract puts engineering, procurement and construction with one company, so one party answers for design, equipment and the working plant.
- Site survey and a study of your electricity use and bills
- Plant design, drawings and equipment selection
- Supply of modules, inverters, mounting structures and electrical equipment
- Installation, testing and commissioning
- Paperwork and coordination with the electricity supplier for connection and metering, where it is in the contract
- Operation and maintenance after handover, where contracted
More detail: Solar EPC Company across India.
Connecting a plant to the grid in Ladakh
JERC's Grid Interactive Renewable Energy System regulations, 2023 cover both Union Territories, so the same rules apply in Ladakh as in Jammu and Kashmir. Eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The regulations were notified on 29 May 2023 and amended once, on 28 June 2024.
- Gross metering is also allowed up to 1 MW. A consumer may use only one of the three arrangements in the same premises.
- The plant may not be larger than the sanctioned load (kW) or the contract demand (kVA). The licensee may consider a net metering plant above 500 kW if its network stays stable.
- A plant above 1 MW under net billing or gross metering needs load flow studies that show no adverse effect on the grid.
- The total capacity under net metering and net billing connected to one distribution transformer or feeder may go up to 100% of its rated capacity.
- Group net metering is open to all consumers for systems of 5 kW to 500 kW. Virtual net metering is only for residential consumers, group housing societies and government or local authority establishments.
- Under net metering, surplus units carry forward as credit. Credit left at the end of the financial year is bought by the licensee at the lower of its average power purchase cost and the feed-in tariff, and paid by 31 May of the next year.
- Under net billing, the surplus is sold to the licensee at the feed-in tariff approved by the Commission. Imports are charged under the tariff order.
- Consumers with arrears are not eligible.
- The First Amendment of 28 June 2024 changed the process. Complete applications up to 10 kW are deemed accepted without a feasibility study. For systems above 10 kW the licensee has 15 days for the study, or the proposal is presumed feasible. After the installation certificate the licensee has 15 days to sign the agreement, fit the meter and commission.
Questions about solar projects in Ladakh
Is net metering available for factories and commercial buildings in Ladakh?
JERC's Grid Interactive Renewable Energy System regulations, 2023 cover both Union Territories, so the same rules apply in Ladakh as in Jammu and Kashmir. Eligible consumers of all categories, commercial and industrial included, can set up a renewable energy system under net metering up to 500 kW. Net billing covers systems above 500 kW and up to 1 MW. The regulations were notified on 29 May 2023 and amended once, on 28 June 2024.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Ladakh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 19 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Administration of UT Ladakh news item of 8 April 2026; Power Development document list on ladakh.gov.in
- Draft State Energy Efficiency Action Plan for Ladakh (Ministry of Power, June 2023, hosted on the Ladakh Power Development Department site): LREDA is the nodal agency for MNRE programmes in Ladakh; the Kargil Renewable Energy Development Agency (KREDA) is the nodal agency for renewable energy projects in Kargil
- JERC (Grid Interactive Renewable Energy system and its related matters) Regulations, 2023, notified 29 May 2023 (Gazette of 12 June 2023; regulation 1.3 extends them to Ladakh), and First Amendment Regulations, 2024, notified 28 June 2024; JERC order No. 05 of 2026 dated 18 August 2026 (para 3.19)
- JERC tariff order No. 05 of 2026 for the Ladakh Power Development Department, dated 18 August 2026, cover page and para 1
- Ladakh Power Development Department website, About Us (LPDD is the only power distribution utility in the UT); JERC tariff order No. 05 of 2026 dated 18 August 2026