Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Ladakh as an EPC contractor: engineering, supply, construction and commissioning.

What Ladakh's policy says about large solar plants

We could not find a notified Ladakh solar policy as of November 2026. On 7 April 2026 the Chief Engineer of the Power Development Department said proposals for a broader solar policy had been placed before the competent authority. Rooftop solar falls under the 2023 regulations of the Joint Electricity Regulatory Commission for Jammu & Kashmir and Ladakh. National schemes (PM Surya Ghar for homes, PM-KUSUM for farmers) apply.

  • The Power Development Department's document list on ladakh.gov.in (updated 16 November 2026) shows only a draft rooftop scheme for commercial consumers, open for comments on 6 June 2025.

JERC's Green Energy Open Access Regulations, 2024 (notified on 12 February 2024) extend to the whole of Ladakh as well as Jammu and Kashmir. A consumer with a contract demand or sanctioned load of 100 kW or more, on one connection or on several in the same electricity division, can take green energy through open access. A captive consumer has no load limit.

  • Banking is on a monthly basis. The banking charge is 8% of the energy banked, taken in kind. The permitted banked energy is at least 30% of the consumer's monthly consumption from the licensee.
  • The regulations say the cross-subsidy surcharge is set in the retail supply tariff order and is not levied when open access carries power from a person's own captive plant to the place of use. The 2026-27 order for the Ladakh Power Development Department does not set a surcharge or wheeling charge figure.

What utility-scale work involves

At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.

  • Land and grid-connection feasibility
  • Detailed engineering for the plant and the evacuation system
  • Procurement and logistics for modules, inverters, transformers and structures
  • Civil, mechanical and electrical construction with several teams working in parallel
  • Testing, commissioning and connection with the transmission or distribution utility
  • Operation and maintenance, where contracted

More detail: Utility-Scale Solar across India.

Questions about solar projects in Ladakh

How much land does a solar plant need?

A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Ladakh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 19 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image