Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Kotdwara, Uttarakhand: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Kotdwara
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 160 km from Kotdwara in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Kotdwara | about 160 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Kotdwara at a glance for solar projects
| District and state | Pauri Garhwal district, Uttarakhand |
|---|---|
| Electricity supply | Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Pauri Garhwal district. |
| Electricity regulator | Uttarakhand Electricity Regulatory Commission (UERC) |
| State renewable energy agency | Uttarakhand Renewable Energy Development Agency (UREDA) |
| State solar policy | Uttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
| Modelled solar output | about 1,340 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 160 km from Kotdwara in a straight line |
Net metering for a house in Kotdwara
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Pauri Garhwal district.
Metering for shops, offices and factories in Kotdwara
In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.
The size limits, charges and other conditions for Uttarakhand are on the page Solar Panel Installation in Uttarakhand.
In Kotdwara the application for connection and metering goes to UPCL.
What a rooftop system produces in Kotdwara
A solar plant in Kotdwara is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,020 units | 30 sq m |
| 5 kW | 6,700 units | 50 sq m |
| 10 kW | 13,400 units | 100 sq m |
| 100 kW | 1.3 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Kotdwara: industrial areas
SIIDCUL, the State Infrastructure and Industrial Development Corporation of Uttarakhand, lists IIE Kotdwar among its industrial areas in Pauri Garhwal district.
The Government of India's One District One Product (ODOP) list names Herbal Products as the product of Pauri Garhwal district.
Subsidy for houses in Kotdwara
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Kotdwara.
Rooftop installations by Somaya Solar near Kotdwara
These are the Somaya Solar projects closest to Kotdwara, with straight-line distances. They are shown as references and are not in Kotdwara unless the line says so.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 40 km from Kotdwara. Included net-metering coordination with the local electricity distribution company.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 50 km from Kotdwara. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 70 km from Kotdwara. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Kotdwara
Which electricity company handles solar connections in Kotdwara?
Uttarakhand Power Corporation Limited (UPCL) is the distribution utility for Uttarakhand and supplies Pauri Garhwal district.
Is net metering available for factories and commercial buildings in Kotdwara?
Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.
How much solar subsidy can a house in Kotdwara get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Kotdwara?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Kotdwara?
About 4,020 units a year, or about 335 a month on average, by the PVGIS model for Kotdwara. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Kotdwara?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Kotdwara?
About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kotdwara?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 160 km from Kotdwara in a straight line. The closest published project is Luminous (1 MW rooftop plant) in Haridwar, about 40 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kotdwara
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- SIIDCUL website home page, menu "Parks" (IIEs and SIDCs)
- UERC (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023, with the First Amendment of 20 June 2024 and the Second Amendment of 27 November 2025, and UERC generic tariff order of 4 June 2026
- UERC tariff order for UPCL, 2026-27 (30 March 2026), section 6.1
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ
- Uttarakhand Electricity Regulatory Commission
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA)
- Uttarakhand State Solar Policy, 2023 (Government of Uttarakhand, published by UREDA), and UERC order of 13 October 2026 in Misc. Application No. 08 of 2026