Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Najibabad, Uttar Pradesh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover. A house in Uttar Pradesh can get up to ₹1,08,000 in subsidy for a 3 kW system: ₹78,000 from the centre and ₹30,000 from the state.

Somaya Solar as your installer in Najibabad

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 140 km from Najibabad in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Najibabadabout 140 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Najibabad at a glance for solar projects

District and stateBijnor district, Uttar Pradesh
Electricity supplyPashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Bijnor district, one of the districts it lists as its area.
Electricity regulatorUttar Pradesh Electricity Regulatory Commission (UPERC)
State renewable energy agencyUttar Pradesh New and Renewable Energy Development Agency (UPNEDA)
State solar policyUttar Pradesh Solar Energy Policy 2022 (five-year term, unless replaced earlier)
Rooftop metering for businessesNet billing or gross metering; no net metering for industry or commerce
Modelled solar outputabout 1,360 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 140 km from Najibabad in a straight line

Net metering for a house in Najibabad

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Bijnor district, one of the districts it lists as its area.

Metering for shops, offices and factories in Najibabad

In Uttar Pradesh, commercial and industrial consumers do not get net metering. Under the regulator's rooftop solar regulations of 2019, as amended, they can use net billing (also called net feed-in) or gross metering. Net metering is kept for domestic and metered agricultural consumers and, since November 2023, for public and educational institutions.

The size limits, charges and other conditions for Uttar Pradesh are on the page Solar Panel Installation in Uttar Pradesh.

In Najibabad the application for connection and metering goes to PVVNL.

What a rooftop system produces in Najibabad

A solar plant in Najibabad is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.

Plant sizeModelled output a yearShadow-free roof needed (typical)
3 kW4,080 units30 sq m
5 kW6,800 units50 sq m
10 kW13,600 units100 sq m
100 kW1.4 lakh units1,000 sq m

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Najibabad

The One District One Product (ODOP) list names Wood Craft as a product of Bijnor district.

The Bijnor district website says the main economy of Bijnor district is cane production, besides some agro-industrial units.

Subsidy for houses in Najibabad

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Uttar Pradesh adds a state subsidy of ₹15,000 per kW, up to ₹30,000 per consumer, for private houses, on top of the central amount, so a 3 kW system can get ₹1,08,000 in all. The full table, the conditions and the application steps are on Solar subsidy in Najibabad.

Rooftop installations by Somaya Solar near Najibabad

These are the Somaya Solar projects closest to Najibabad, with straight-line distances. They are shown as references and are not in Najibabad unless the line says so.

  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 40 km from Najibabad. Included net-metering coordination with the local electricity distribution company.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 50 km from Najibabad. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 70 km from Najibabad. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Najibabad

Which electricity company handles solar connections in Najibabad?

Pashchimanchal Vidyut Vitran Nigam Limited (PVVNL) supplies electricity in Bijnor district, one of the districts it lists as its area.

Is net metering available for factories and commercial buildings in Najibabad?

Net billing or gross metering; no net metering for industry or commerce. The rule is the same across Uttar Pradesh.

How much solar subsidy can a house in Najibabad get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Uttar Pradesh adds a state subsidy of ₹15,000 per kW, up to ₹30,000 per consumer, for private houses, on top of the central amount, so a 3 kW system can get ₹1,08,000 in all.

How much roof does a home solar system need in Najibabad?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Najibabad?

About 4,080 units a year, or about 340 a month on average, by the PVGIS model for Najibabad. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Najibabad?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

How much electricity does a solar plant generate in Najibabad?

About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Najibabad?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 140 km from Najibabad in a straight line. The closest published project is Luminous (1 MW rooftop plant) in Haridwar, about 40 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Najibabad

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.