Solar Panel Installation in Uttarakhand

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Uttarakhand: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Uttarakhand

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Uttarakhand at a glance for solar projects

Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
Electricity distributionUPCL (The whole state: all 13 districts, including Dehradun, Haridwar, Udham Singh Nagar, Nainital, Pauri, Tehri, Almora and Pithoragarh)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load

Net metering for a house in Uttarakhand

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Uttarakhand

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

  • Energy is settled on a net basis at the end of each billing period, which is one month.
  • If the consumer exports more than it draws in a billing period, UPCL pays for the surplus at the regulator's generic tariff or the rate found through bidding, whichever is lower. The generic tariff is ₹2.00 per kWh for plants commissioned in 2026-27.
  • The total rooftop capacity connected to one transformer may not exceed the capacity of that transformer.
  • Group net metering lets one consumer set off surplus energy against its other connections in UPCL's area. A plant under group or virtual net metering must be between 5 kW and 75 kW. Virtual net metering is only for domestic consumers and offices of government and local authorities.
  • The latest amendment is the second amendment, notified on 27 November 2025. It deals with battery energy storage and left the rooftop limits unchanged. In its reasons the regulator declined a request to remove the 1 MW ceiling.
  • A consumer who needs more than 1 MW can set up a captive plant. The regulator has said a captive plant has no capacity restriction.

What a rooftop system produces in Uttarakhand

Solar output changes across Uttarakhand with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,280 to 1,390 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Almora1,3401,430
Bazpur1,3801,480
Clement Town1,3401,440
Dehradun1,3401,450
Haldwani1,3701,460
Haridwar1,3701,470
Jaspur1,3701,460
Kashipur1,3901,480
Kichha1,3801,470
Kotdwara1,3401,440
Manglaur1,3801,480
Mussoorie1,3301,420
Naini Tal1,3601,460
Pauri1,2901,400
Pithoragarh1,2801,370
Ramnagar1,3601,460
Rishikesh1,3301,420
Roorkee1,3801,480
Rudrapur1,3901,480
Sitarganj1,3701,470
Srinagar1,3001,400
Tehri1,3201,430

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Uttarakhand

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Uttarakhand.

Rooftop installations by Somaya Solar in Uttarakhand

Somaya Solar's published projects in Uttarakhand:

  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand. Completed in two months, with five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Uttarakhand

Is net metering available for factories and commercial buildings in Uttarakhand?

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

How much solar subsidy can a house in Uttarakhand get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Uttarakhand?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Uttarakhand?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Uttarakhand are: Naini Papers Limited (3 MW rooftop plant, Kashipur); Akums Limited (2.3 MW rooftop plant, SIDCUL, Haridwar); Luminous (1 MW rooftop plant, Haridwar).

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Uttarakhand

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image