Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Vasco da Gama, Goa: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Vasco da Gama
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1520 km from Vasco da Gama in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Vasco da Gama | about 1520 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Vasco da Gama at a glance for solar projects
| District and state | South Goa district, Goa |
|---|---|
| Electricity supply | Electricity Department, Government of Goa (ED Goa) supplies Vasco da Gama, which the cited source places in its supply area. |
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
| State renewable energy agency | Goa Energy Development Agency (GEDA) |
| State solar policy | Goa State Solar Policy 2017 (with amendments): seven-year term, ended February 2026 on its own wording |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,380 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1520 km from Vasco da Gama in a straight line |
Net metering for a house in Vasco da Gama
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Electricity Department, Government of Goa (ED Goa) supplies Vasco da Gama, which the cited source places in its supply area.
Metering for shops, offices and factories in Vasco da Gama
In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
The size limits, charges and other conditions for Goa are on the page Solar Panel Installation in Goa.
In Vasco da Gama the application for connection and metering goes to ED Goa.
What a rooftop system produces in Vasco da Gama
A solar plant in Vasco da Gama is modelled to produce about 1,380 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,140 units | 30 sq m |
| 5 kW | 6,900 units | 50 sq m |
| 10 kW | 13,800 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Vasco da Gama
The Government of India's One District One Product (ODOP) list names Feni and Cashew Nuts as the products of South Goa district.
Subsidy for houses in Vasco da Gama
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Vasco da Gama.
Rooftop installations by Somaya Solar near Vasco da Gama
These are the Somaya Solar projects closest to Vasco da Gama, with straight-line distances. They are shown as references and are not in Vasco da Gama unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1520 km from Vasco da Gama. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1620 km from Vasco da Gama. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1680 km from Vasco da Gama. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Vasco da Gama
Which electricity company handles solar connections in Vasco da Gama?
Electricity Department, Government of Goa (ED Goa) supplies Vasco da Gama, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Vasco da Gama?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.
How much solar subsidy can a house in Vasco da Gama get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Vasco da Gama?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Vasco da Gama?
About 4,140 units a year, or about 345 a month on average, by the PVGIS model for Vasco da Gama. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Vasco da Gama?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Vasco da Gama?
About 1,380 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.8 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Vasco da Gama?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1520 km from Vasco da Gama in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1520 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Vasco da Gama
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- ED Goa: source naming Vasco da Gama within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- Goa Energy Development Agency, model Power Purchase Agreement for PM-KUSUM Component A (recital C), and Government of Goa press release of 14 August 2026
- Goa State Solar Policy-2017, Official Gazette Series I No. 45, 7 Feb 2019 (Electricity Department, Government of Goa)
- Government of Goa, Department of Revenue, Notification 16/29/1/2023-Rev-I/3259 of 31 December 2025 (Official Gazette, Series I No. 39, Extraordinary No. 2): districts, sub-divisions, talukas and villages
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order for the Electricity Department, Government of Goa, Petition No. 141/2025, dated 30 September 2025 (section 1.1)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ