Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Curchorem, Goa: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Curchorem
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1530 km from Curchorem in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Curchorem | about 1530 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Curchorem at a glance for solar projects
| District and state | Kushavati district, Goa |
|---|---|
| Electricity supply | Electricity Department, Government of Goa (ED Goa) supplies Curchorem, which the cited source places in its supply area. |
| Electricity regulator | Joint Electricity Regulatory Commission for the State of Goa and Union Territories (JERC) |
| State renewable energy agency | Goa Energy Development Agency (GEDA) |
| State solar policy | Goa State Solar Policy 2017 (with amendments): seven-year term, ended February 2026 on its own wording |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,320 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1530 km from Curchorem in a straight line |
Net metering for a house in Curchorem
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Electricity Department, Government of Goa (ED Goa) supplies Curchorem, which the cited source places in its supply area.
Metering for shops, offices and factories in Curchorem
In Goa, a consumer can connect a rooftop, ground-mounted or floating solar plant of up to 500 kWp at one premises under JERC's net metering regulations of 2019, as amended in 2024. A plant above 500 kWp comes under net billing (net feed-in). The plant may not be larger than the consumer's contract demand or sanctioned load. The plant may be owned by the consumer or by a third party.
The size limits, charges and other conditions for Goa are on the page Solar Panel Installation in Goa.
In Curchorem the application for connection and metering goes to ED Goa.
What a rooftop system produces in Curchorem
A solar plant in Curchorem is modelled to produce about 1,320 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 3,960 units | 30 sq m |
| 5 kW | 6,600 units | 50 sq m |
| 10 kW | 13,200 units | 100 sq m |
| 100 kW | 1.3 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Curchorem
Curchorem is a revenue village in Quepem taluka, according to the revenue village list on the South Goa district website.
Kushavati district, formed from the former South Goa district by Goa government notification dated 31 December 2025, comprises four talukas: Dharbandora, Sanguem, Quepem and Canacona.
Subsidy for houses in Curchorem
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Curchorem.
Rooftop installations by Somaya Solar near Curchorem
These are the Somaya Solar projects closest to Curchorem, with straight-line distances. They are shown as references and are not in Curchorem unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1530 km from Curchorem. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1630 km from Curchorem. Completed in two months, with five years of operation and maintenance.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 1680 km from Curchorem. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
Questions about solar projects in Curchorem
Which electricity company handles solar connections in Curchorem?
Electricity Department, Government of Goa (ED Goa) supplies Curchorem, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Curchorem?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Goa.
How much solar subsidy can a house in Curchorem get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Curchorem?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Curchorem?
About 3,960 units a year, or about 330 a month on average, by the PVGIS model for Curchorem. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Curchorem?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Curchorem?
About 1,320 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Curchorem?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1530 km from Curchorem in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1530 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Curchorem
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- ED Goa: source naming Curchorem within its supply area
- GeoNames (place coordinates, CC BY 4.0)
- Goa Energy Development Agency, model Power Purchase Agreement for PM-KUSUM Component A (recital C), and Government of Goa press release of 14 August 2026
- Goa State Solar Policy-2017, Official Gazette Series I No. 45, 7 Feb 2019 (Electricity Department, Government of Goa)
- Government of Goa, Department of Revenue, Notification 16/29/1/2023-Rev-I/3259 of 31 December 2025 (Official Gazette, Series I No. 39, Extraordinary No. 2): districts, sub-divisions, talukas and villages
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019 (No. JERC-24/2019, notified 24 July 2019) and the Net Metering & Gross Metering (First Amendment) Regulations, 2024 (notified 1 August 2024, Gazette of India 11 September 2024)
- JERC Tariff Order for the Electricity Department, Government of Goa, Petition No. 141/2025, dated 30 September 2025 (section 1.1)
- Kushavati District (Goa Government / NIC), About District
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- South Goa District (NIC), Revenue Villages list
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ