Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Sampla, Haryana: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Sampla
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 70 km from Sampla in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Sampla | about 70 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Sampla at a glance for solar projects
| District and state | Rohtak district, Haryana |
|---|---|
| Electricity supply | Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Rohtak district, one of the districts it lists as its area. |
| Electricity regulator | Haryana Electricity Regulatory Commission (HERC) |
| State renewable energy agency | Haryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA) |
| State solar policy | Haryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified) |
| Rooftop metering for businesses | Net metering up to 500 kW, within the sanctioned load |
| Modelled solar output | about 1,420 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 70 km from Sampla in a straight line |
Net metering for a house in Sampla
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Rohtak district, one of the districts it lists as its area.
Metering for shops, offices and factories in Sampla
In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.
The size limits, charges and other conditions for Haryana are on the page Solar Panel Installation in Haryana.
In Sampla the application for connection and metering goes to UHBVN.
What a rooftop system produces in Sampla
A solar plant in Sampla is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,260 units | 30 sq m |
| 5 kW | 7,100 units | 50 sq m |
| 10 kW | 14,200 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Sampla
The Government of India's One District One Product (ODOP) list names Fasteners and Machine Tools as the product of Rohtak district.
Subsidy for houses in Sampla
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Sampla.
Rooftop installations by Somaya Solar near Sampla
These are the Somaya Solar projects closest to Sampla, with straight-line distances. They are shown as references and are not in Sampla unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 180 km from Sampla. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 190 km from Sampla. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 220 km from Sampla. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Sampla
Which electricity company handles solar connections in Sampla?
Uttar Haryana Bijli Vitran Nigam Limited (UHBVN) supplies electricity in Rohtak district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Sampla?
Net metering up to 500 kW, within the sanctioned load. The rule is the same across Haryana.
How much solar subsidy can a house in Sampla get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Sampla?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Sampla?
About 4,260 units a year, or about 355 a month on average, by the PVGIS model for Sampla. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Sampla?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Sampla?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Sampla?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 70 km from Sampla in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 180 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Sampla
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of New & Renewable Energy, Haryana (HAREDA) website, and Haryana Solar Power Policy, 2016 (notified 14 March 2016)
- Directorate of Urban Local Bodies, Haryana: Municipalities - Key Figures (table S.No | District | MC Name | MC Type; page states data as on 11-11-2026)
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering/Gross Metering) Regulations, 2021, notified 19 July 2021, with the first amendment of 15 July 2024 and the second amendment of 30 October 2025 (as circulated in UHBVN Sales Circulars U-29/2021, U-33/2024 and U-16/2025)
- Haryana Government Gazette of 11 November 2025 (HERC notification of 30 October 2025), as circulated in UHBVN Sales Circular U-16/2025
- Haryana Solar Power Policy, 2016 (Renewable Energy Department, Government of Haryana, notification of 14 March 2016), with addenda of 19 May 2016 and 23 June 2017
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UHBVN website, About UHBVN
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ