Solar Panel Installation in Haryana

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Haryana: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Haryana

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Haryana at a glance for solar projects

Electricity regulatorHaryana Electricity Regulatory Commission (HERC)
State renewable energy agencyHaryana Renewable Energy Development Agency, under the Department of New & Renewable Energy, Haryana (HAREDA)
Electricity distributionUHBVN (Panchkula, Ambala, Yamunanagar, Kurukshetra, Kaithal, Karnal, Panipat, Sonipat, Rohtak and Jhajjar districts (north Haryana)); DHBVN (Faridabad, Palwal, Nuh, Gurugram, Mahendragarh, Rewari, Bhiwani, Charkhi Dadri, Hisar, Fatehabad, Sirsa and Jind districts (south Haryana))
State solar policyHaryana Solar Power Policy, 2016 (notified 14 March 2016; in force until a new policy is notified)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load

Net metering for a house in Haryana

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Haryana

In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.

  • Gross metering is the other arrangement under the same regulations. It is allowed up to the sanctioned load or contract demand. Net billing, group net metering and virtual net metering do not appear in the regulations or their two amendments.
  • The plant may not be larger than the sanctioned load (low-tension connection) or the contract demand (high-tension connection). The smallest plant allowed is 1 kW.
  • The total rooftop capacity on one distribution transformer may not exceed 50% of that transformer's rated capacity. On a power transformer the limit is 30%.
  • The second amendment, notified on 30 October 2025 and published in the gazette on 11 November 2025, removed the old rule that set off solar units against only 90% of consumption. The settlement period now runs from 1 October to 30 September.
  • Units left unadjusted at the end of the settlement period are bought by the distribution company at 90% of the feed-in tariff in the regulations. The 2021 regulations set that tariff at ₹3.11 per unit for five years. Check the current rate with the distribution company.
  • A consumer who draws power through open access cannot have net metering. A plant larger than the sanctioned load or contract demand has to use a route other than net or gross metering.
  • The plant may be owned by the consumer or by a third party (RESCO model). The consumer keeps paying fixed or demand charges.

What a rooftop system produces in Haryana

Solar output changes across Haryana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,380 to 1,460 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Ambala1,4001,500
Ambala Sadar1,4001,500
Asandh1,4201,510
Bahadurgarh1,4201,520
Barara1,4001,500
Bawal1,4301,520
Bawani Khera1,4301,530
Bhiwani1,4301,520
Charkhi Dadri1,4301,520
Chika1,4101,510
Dabwali1,4501,540
Dharuhera1,4301,520
Ellenabad1,4601,560
Faridabad1,4201,510
Fatehabad1,4401,530
Firozpur Jhirka1,4201,510
Ganaur1,4201,510
Gharaunda1,4101,510
Gohana1,4301,520
Gurugram1,4201,510
Hisar1,4501,540
Hodal1,4201,500
Jagadhri1,3801,490
Jhajjar1,4301,520
Jind1,4201,520
Kaithal1,4201,510
Kalanaur1,4301,520
Kalanwali1,4401,540
Karnal1,4201,510
Kharkhauda1,4201,520
Kundli1,4201,510
Kurukshetra1,4101,510
Ladwa1,4001,500
Maham1,4301,520
Mahendragarh1,4401,530
Mandi Dabwali1,4501,540
Manesar1,4301,520
Naraingarh1,3901,490
Narnaul1,4401,530
Narwana1,4301,520
Palwal1,4201,510
Panchkula1,3901,500
Panipat1,4201,510
Pataudi1,4301,520
Pehowa1,4201,520
Pinjaur1,3801,490
Punahana1,4201,500
Pundri1,4201,510
Rania1,4401,540
Ratia1,4401,530
Rewari1,4301,520
Rohtak1,4301,520
Safidon1,4201,520
Samalkha1,4201,510
Sampla1,4201,510
Shahabad1,4101,510
Sirsa1,4401,540
Sohna1,4201,510
Sonipat1,4201,510
Taoru1,4301,520
Thanesar1,4101,510
Tirawari1,4101,510
Tohana1,4301,530
Yamunanagar1,3901,490

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Haryana

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Haryana.

Questions about solar projects in Haryana

Is net metering available for factories and commercial buildings in Haryana?

In Haryana, net metering is open to every consumer except agricultural tube-well consumers, for loads up to 500 kW or up to the sanctioned load or contract demand, whichever is lower. The rules are in the regulator's rooftop solar regulations of 2021, last amended on 30 October 2025.

How much solar subsidy can a house in Haryana get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Haryana?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Haryana?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Haryana

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image