Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Gobindgarh, Punjab: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Gobindgarh
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 250 km from Gobindgarh in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Gobindgarh | about 250 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Gobindgarh at a glance for solar projects
| District and state | Fatehgarh Sahib district, Punjab |
|---|---|
| Electricity supply | Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Fatehgarh Sahib district. |
| Electricity regulator | Punjab State Electricity Regulatory Commission (PSERC) |
| State renewable energy agency | Punjab Energy Development Agency (PEDA) |
| State solar policy | New and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
| Modelled solar output | about 1,400 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 250 km from Gobindgarh in a straight line |
Net metering for a house in Gobindgarh
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Fatehgarh Sahib district.
Metering for shops, offices and factories in Gobindgarh
In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.
The size limits, charges and other conditions for Punjab are on the page Solar Panel Installation in Punjab.
In Gobindgarh the application for connection and metering goes to PSPCL.
What a rooftop system produces in Gobindgarh
A solar plant in Gobindgarh is modelled to produce about 1,400 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,200 units | 30 sq m |
| 5 kW | 7,000 units | 50 sq m |
| 10 kW | 14,000 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Gobindgarh: industrial areas
PSIEC, the Punjab Small Industries and Export Corporation, lists Mandi Gobindgar and IP Mandi Gobindgarh among its industrial areas in Fatehgarh Sahib district.
The Government of India's One District One Product (ODOP) list names Forged Items and Machine parts/ Rolling Mill Machinery as the products of Fatehgarh Sahib district.
Subsidy for houses in Gobindgarh
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Gobindgarh.
Rooftop installations by Somaya Solar near Gobindgarh
These are the Somaya Solar projects closest to Gobindgarh, with straight-line distances. They are shown as references and are not in Gobindgarh unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 190 km from Gobindgarh. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 200 km from Gobindgarh. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 300 km from Gobindgarh. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Gobindgarh
Which electricity company handles solar connections in Gobindgarh?
Punjab State Power Corporation Limited (PSPCL) is the distribution utility for Punjab and supplies Fatehgarh Sahib district.
Is net metering available for factories and commercial buildings in Gobindgarh?
Net metering up to 500 kWp, within the sanctioned load. The rule is the same across Punjab.
How much solar subsidy can a house in Gobindgarh get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Gobindgarh?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Gobindgarh?
About 4,200 units a year, or about 350 a month on average, by the PVGIS model for Gobindgarh. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Gobindgarh?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Gobindgarh?
About 1,400 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.0 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Gobindgarh?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 250 km from Gobindgarh in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 190 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Gobindgarh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- New and Renewable Sources of Energy (NRSE) Policy, 2012, Government of Punjab notification of 26 December 2012, with the amendment of 9 July 2015
- New and Renewable Sources of Energy (NRSE) Policy, 2012, clause 4.2 (Government of Punjab, 26 December 2012), and the PEDA website
- PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, with the Third Amendment notified on 7 April 2026 (Punjab Government Gazette, 11 April 2026)
- PSERC Tariff Order FY 2026-27 for PSPCL (order dated 06 March 2026), Chapter 1, page 1
- PSIEC (Punjab Small Industries and Export Corporation): Focal Points Layout Plan page (focal points list and "Areas of ZONE" lists)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- Punjab State Electricity Regulatory Commission
- State Election Commission Punjab: "List of District-wise Class-I, II, III and Nagar Panchayats in the State of Punjab" (scanned page 5, posted 14 Aug 2023; includes bodies constituted up to 30-12-2021; 23 districts; quote read from the scanned image)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ