Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Punjab: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Punjab
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Punjab at a glance for solar projects
| Electricity regulator | Punjab State Electricity Regulatory Commission (PSERC) |
|---|---|
| State renewable energy agency | Punjab Energy Development Agency (PEDA) |
| Electricity distribution | PSPCL (The whole of Punjab, including Ludhiana, Amritsar, Bathinda and Patiala) |
| State solar policy | New and Renewable Sources of Energy (NRSE) Policy, 2012 (in force until the government notifies a new policy) |
| Rooftop metering for businesses | Net metering up to 500 kWp, within the sanctioned load |
Net metering for a house in Punjab
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Punjab
In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.
- Net billing and behind-the-meter plants can go up to the sanctioned load or contract demand, with no 500 kWp ceiling. A behind-the-meter plant is not paid for any power it sends to the grid.
- Gross metering starts at 5 kWp and can go up to the sanctioned load or contract demand.
- Group net metering, in force from 1 July 2026, lets one plant of 5 kWp to 500 kWp serve the same consumer's other connections of the same category. Virtual net metering is for domestic consumers only.
- A consumer can choose only one arrangement. Under net metering, credits left at the end of the settlement period are paid at 75% of the feed-in tariff, which is ₹2.97 per unit for 2026-27.
- The total rooftop capacity connected to one distribution transformer or feeder may not exceed 80% of its rated capacity.
What a rooftop system produces in Punjab
Solar output changes across Punjab with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,450 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Abohar | 1,450 | 1,550 |
| Adampur | 1,380 | 1,480 |
| Ahmedgarh | 1,410 | 1,510 |
| Ajnala | 1,370 | 1,470 |
| Amritsar | 1,380 | 1,480 |
| Bagha Purana | 1,410 | 1,510 |
| Balachor | 1,380 | 1,480 |
| Banga | 1,390 | 1,490 |
| Barnala | 1,410 | 1,510 |
| Batala | 1,360 | 1,470 |
| Bathinda | 1,430 | 1,530 |
| Bhawanigarh | 1,410 | 1,500 |
| Budhlada | 1,430 | 1,530 |
| Dasuya | 1,350 | 1,450 |
| Dera Bassi | 1,390 | 1,500 |
| Dhariwal | 1,360 | 1,460 |
| Dhuri | 1,410 | 1,510 |
| Dinanagar | 1,340 | 1,440 |
| Doraha | 1,400 | 1,500 |
| Faridkot | 1,420 | 1,520 |
| Fazilka | 1,440 | 1,540 |
| Firozpur | 1,410 | 1,510 |
| Giddarbaha | 1,440 | 1,540 |
| Gobindgarh | 1,400 | 1,500 |
| Gurdaspur | 1,340 | 1,440 |
| Hoshiarpur | 1,360 | 1,460 |
| Jagraon | 1,400 | 1,500 |
| Jaito | 1,430 | 1,530 |
| Jalalabad | 1,420 | 1,520 |
| Jalandhar | 1,380 | 1,480 |
| Jandiala Guru | 1,370 | 1,470 |
| Kapurthala | 1,380 | 1,480 |
| Kartarpur | 1,380 | 1,480 |
| Khanna | 1,400 | 1,500 |
| Kot Kapura | 1,420 | 1,520 |
| Kotkapura | 1,420 | 1,520 |
| Kurali | 1,390 | 1,490 |
| Lalru | 1,400 | 1,510 |
| Laungowal | 1,420 | 1,520 |
| Lehragaga | 1,430 | 1,530 |
| Longowal | 1,420 | 1,520 |
| Ludhiana | 1,400 | 1,500 |
| Machhiwara | 1,390 | 1,500 |
| Maler Kotla | 1,400 | 1,500 |
| Malout | 1,450 | 1,540 |
| Mansa | 1,430 | 1,530 |
| Maur | 1,430 | 1,520 |
| Moga | 1,400 | 1,500 |
| Mohali | 1,400 | 1,500 |
| Morinda | 1,390 | 1,500 |
| Mukerian | 1,350 | 1,450 |
| Muktsar | 1,430 | 1,530 |
| Nabha | 1,410 | 1,510 |
| Nakodar | 1,390 | 1,490 |
| Nangal | 1,360 | 1,470 |
| Nawanshahr | 1,390 | 1,490 |
| Naya Gaon | 1,370 | 1,480 |
| Pathankot | 1,310 | 1,420 |
| Patiala | 1,400 | 1,500 |
| Patran | 1,420 | 1,520 |
| Patti | 1,390 | 1,490 |
| Phagwara | 1,390 | 1,490 |
| Phillaur | 1,390 | 1,490 |
| Qadian | 1,360 | 1,460 |
| Raikot | 1,410 | 1,510 |
| Rajpura | 1,400 | 1,510 |
| Raman | 1,440 | 1,540 |
| Rampura | 1,420 | 1,520 |
| Rampura Phul | 1,420 | 1,520 |
| Ropar | 1,380 | 1,490 |
| Samana | 1,420 | 1,510 |
| Sanaur | 1,410 | 1,510 |
| Sanehwal | 1,400 | 1,500 |
| Sangrur | 1,420 | 1,520 |
| Sirhind | 1,400 | 1,500 |
| Sujanpur | 1,320 | 1,430 |
| Sunam | 1,420 | 1,520 |
| Talwandi Sabo | 1,440 | 1,540 |
| Talwara | 1,340 | 1,440 |
| Tapa | 1,420 | 1,520 |
| Tarn Taran | 1,390 | 1,490 |
| Urmar | 1,370 | 1,470 |
| Zerakpur | 1,390 | 1,500 |
| Zira | 1,410 | 1,510 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Punjab
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Punjab.
Questions about solar projects in Punjab
Is net metering available for factories and commercial buildings in Punjab?
In Punjab, commercial and industrial consumers can use net metering for a rooftop plant from 1 kWp up to their sanctioned load or contract demand, with a ceiling of 500 kWp. The regulator set this in the third amendment to its 2021 rooftop regulations, notified on 7 April 2026. Before that, a non-domestic consumer could install only up to 70% of the sanctioned load.
How much solar subsidy can a house in Punjab get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Punjab?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Punjab?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Punjab
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- New and Renewable Sources of Energy (NRSE) Policy, 2012, Government of Punjab notification of 26 December 2012, with the amendment of 9 July 2015
- New and Renewable Sources of Energy (NRSE) Policy, 2012, clause 4.2 (Government of Punjab, 26 December 2012), and the PEDA website
- PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021, with the Third Amendment notified on 7 April 2026 (Punjab Government Gazette, 11 April 2026)
- PSERC tariff order for PSPCL for 2026-27, Chapter 1, dated 6 March 2026, and PSERC order of 19 August 2026 in Petition No. 57 of 2026
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- Punjab State Electricity Regulatory Commission
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ