Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Baddi, Himachal Pradesh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Baddi
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 260 km from Baddi in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Baddi | about 260 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Baddi at a glance for solar projects
| District and state | Solan district, Himachal Pradesh |
|---|---|
| Electricity supply | Himachal Pradesh State Electricity Board Limited (HPSEBL) is the deemed licensee for distribution and supply of electricity across Himachal Pradesh, so it supplies Baddi. HPSEBL's organisation chart places its Baddi electrical division under the Solan operation circle. |
| Electricity regulator | Himachal Pradesh Electricity Regulatory Commission (HPERC) |
| State renewable energy agency | Himachal Pradesh Energy Development Agency (HIMURJA) |
| State solar policy | Swaran Jayanti Energy Policy, 2021 (notified on 20 January 2022, as amended) |
| Rooftop metering for businesses | Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp |
| Modelled solar output | about 1,370 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 260 km from Baddi in a straight line |
Net metering for a house in Baddi
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Himachal Pradesh State Electricity Board Limited (HPSEBL) is the deemed licensee for distribution and supply of electricity across Himachal Pradesh, so it supplies Baddi. HPSEBL's organisation chart places its Baddi electrical division under the Solan operation circle.
Metering for shops, offices and factories in Baddi
In Himachal Pradesh a consumer of HPSEBL can install rooftop solar under net metering up to 50 kWp. A system above 50 kWp and up to 1 MWp goes under net billing. The rules are in HPERC's Rooftop Solar PV Grid Interactive System Regulations, 2015, as amended four times, most recently on 19 August 2026.
The size limits, charges and other conditions for Himachal Pradesh are on the page Solar Panel Installation in Himachal Pradesh.
In Baddi the application for connection and metering goes to HPSEBL.
What a rooftop system produces in Baddi
A solar plant in Baddi is modelled to produce about 1,370 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,110 units | 30 sq m |
| 5 kW | 6,850 units | 50 sq m |
| 10 kW | 13,700 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Baddi: the Baddi-Barotiwala-Nalagarh industrial area
Baddi is one of the four growth centres of the Baddi Barotiwala Nalagarh Development Authority (BBNDA), with Barotiwala, Nalagarh and Panjhera. The authority, set up in 2006, describes its planning area as the largest in Himachal Pradesh: 31,814 hectares across 229 revenue villages, with about 5,000 industrial units.
The Government of India's One District One Product (ODOP) list names Mushrooms as the product of Solan district.
Subsidy for houses in Baddi
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Baddi.
Rooftop installations by Somaya Solar near Baddi
These are the Somaya Solar projects closest to Baddi, with straight-line distances. They are shown as references and are not in Baddi unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 160 km from Baddi. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 170 km from Baddi. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 290 km from Baddi. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Baddi
Which electricity company handles solar connections in Baddi?
Himachal Pradesh State Electricity Board Limited (HPSEBL) is the deemed licensee for distribution and supply of electricity across Himachal Pradesh, so it supplies Baddi. HPSEBL's organisation chart places its Baddi electrical division under the Solan operation circle.
Is net metering available for factories and commercial buildings in Baddi?
Net metering up to 50 kWp; net billing above 50 kWp up to 1 MWp. The rule is the same across Himachal Pradesh.
How much solar subsidy can a house in Baddi get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Baddi?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Baddi?
About 4,110 units a year, or about 342 a month on average, by the PVGIS model for Baddi. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Baddi?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Baddi?
About 1,370 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.7 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Baddi?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 260 km from Baddi in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 160 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Baddi
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Baddi Barotiwala Nalagarh Development Authority: About Us
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- HPERC (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024, clause 22A, which names HIMURJA as a State Nodal Agency
- HPERC (Rooftop Solar PV Grid Interactive System) Regulations, 2015, with the First Amendment of 6 November 2018, the Second Amendment of 14 September 2022, the Third Amendment of 12 June 2024 and the Fourth Amendment of 19 August 2026
- HPERC orders of 22 July 2026 (Petition No. 121 of 2026), 9 October 2026 (Petition No. 179 of 2026) and 22 March 2025 (Petition No. 20 of 2025), which apply the Swaran Jayanti Energy Policy, 2021; Directorate of Energy, Government of Himachal Pradesh, scheme for solar power projects above 5 MW (published 10 March 2026)
- HPERC tariff order for HPSEBL for 2026-27, dated 25 March 2026 (paragraph 1.1.4); HPSEBL organisation chart (hpseb.in)
- Himachal Pradesh Electricity Regulatory Commission
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- Solan district administration: Municipalities (Municipal Committee Baddi, District Solan)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ