Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Williamnagar, Meghalaya: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Williamnagar
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1350 km from Williamnagar in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Williamnagar | about 1350 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Williamnagar at a glance for solar projects
| District and state | East Garo Hills district, Meghalaya |
|---|---|
| Electricity supply | Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Garo Hills district. |
| Electricity regulator | Meghalaya State Electricity Regulatory Commission (MSERC) |
| State renewable energy agency | Meghalaya New and Renewable Energy Development Agency (MNREDA) |
| State solar policy | Meghalaya Power Policy, 2024 (in force until 31 March 2030 unless notified otherwise) |
| Rooftop metering for businesses | Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW |
| Modelled solar output | about 1,150 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1350 km from Williamnagar in a straight line |
Net metering for a house in Williamnagar
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Garo Hills district.
Metering for shops, offices and factories in Williamnagar
In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.
The size limits, charges and other conditions for Meghalaya are on the page Solar Panel Installation in Meghalaya.
In Williamnagar the application for connection and metering goes to MePDCL.
What a rooftop system produces in Williamnagar
A solar plant in Williamnagar is modelled to produce about 1,150 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 3,450 units | 30 sq m |
| 5 kW | 5,750 units | 50 sq m |
| 10 kW | 11,500 units | 100 sq m |
| 100 kW | 1.1 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Williamnagar
The Government of India's One District One Product (ODOP) list names Pineapple as the product of East Garo Hills district.
Subsidy for houses in Williamnagar
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Williamnagar.
Rooftop installations by Somaya Solar near Williamnagar
These are the Somaya Solar projects closest to Williamnagar, with straight-line distances. They are shown as references and are not in Williamnagar unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1100 km from Williamnagar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1220 km from Williamnagar. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1320 km from Williamnagar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Williamnagar
Which electricity company handles solar connections in Williamnagar?
Meghalaya Power Distribution Corporation Limited (MePDCL) is the distribution utility for Meghalaya and supplies East Garo Hills district.
Is net metering available for factories and commercial buildings in Williamnagar?
Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW. The rule is the same across Meghalaya.
How much solar subsidy can a house in Williamnagar get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Williamnagar?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Williamnagar?
About 3,450 units a year, or about 288 a month on average, by the PVGIS model for Williamnagar. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Williamnagar?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Williamnagar?
About 1,150 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Williamnagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1350 km from Williamnagar in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1100 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Williamnagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026, notification of 30 April 2026; MSERC public notice of 1 October 2026
- MSERC order, Case No. 11 of 2025 (MePDCL, FY 2026-27, 26 March 2026)
- Meghalaya New And Renewable Energy Development Agency (State Nodal Agency for MNRE); MSERC DRE Regulations, 2026 preamble
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- Meghalaya State Electricity Regulatory Commission
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ