Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Meghalaya: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Meghalaya
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Meghalaya at a glance for solar projects
| Electricity regulator | Meghalaya State Electricity Regulatory Commission (MSERC) |
|---|---|
| State renewable energy agency | Meghalaya New and Renewable Energy Development Agency (MNREDA) |
| Electricity distribution | MePDCL (The whole state of Meghalaya) |
| State solar policy | Meghalaya Power Policy, 2024 (in force until 31 March 2030 unless notified otherwise) |
| Rooftop metering for businesses | Commercial and industrial: net billing up to the sanctioned load or 500 kW, whichever is lower; gross metering up to 10 MW |
Net metering for a house in Meghalaya
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Meghalaya
In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.
- Net metering is for domestic, agricultural, group housing, charitable institution, government building and local authority consumers only.
- Net billing is open to all categories, from 1 kW up to the sanctioned load or contract demand or 500 kW, whichever is lower. Exports are credited at 100% of the weighted average tariff of solar projects of 5 MW or above found through competitive bidding in the last financial year, or a reference rate set by MSERC. Imports are billed at the retail tariff. Any net credit at the end of the settlement period is paid to the consumer.
- Gross metering is open to all categories, up to 10 MW, in the consumer's premises or at another location. All the energy generated is sold to the distribution company.
- Behind-the-meter is open to all categories, from 1 kW up to the sanctioned load or contract demand.
- Group and virtual net metering are open only to the same categories as net metering.
- No grid support charge applies to net metering, net billing or gross metering. MSERC may set one for group net metering, virtual net metering and behind-the-meter systems.
- The total of rooftop and other distributed plants on a distribution transformer may not exceed 80% of its rated capacity, or 100% of a feeder's capacity.
- An application up to the sanctioned load or 10 kW, whichever is lower, is deemed accepted without a feasibility study.
- On 1 October 2026 MSERC pre-published a draft First Amendment and invited comments until 14 October 2026. It is a draft. Whether it has been notified is not confirmed.
What a rooftop system produces in Meghalaya
Solar output changes across Meghalaya with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,150 to 1,200 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Jowai | 1,190 | 1,260 |
| Khliehriat | 1,200 | 1,260 |
| Nongstoin | 1,150 | 1,210 |
| Resubelpara | 1,160 | 1,220 |
| Shillong | 1,170 | 1,240 |
| Tura | 1,190 | 1,260 |
| Williamnagar | 1,150 | 1,220 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Meghalaya
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Meghalaya.
Questions about solar projects in Meghalaya
Is net metering available for factories and commercial buildings in Meghalaya?
In Meghalaya, net metering is open only to domestic, agricultural, group housing, charitable, government and local authority consumers. A commercial or industrial consumer can use net billing, gross metering or behind-the-meter. The rules are in MSERC's Grid Interactive Distributed Renewable Energy Sources (2 of 2026) Regulations, 2026, notified on 30 April 2026. They replaced the 2015 rooftop net metering regulations.
How much solar subsidy can a house in Meghalaya get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Meghalaya?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Meghalaya?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Meghalaya
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MSERC (Grid Interactive Distributed Renewable Energy Sources) (2 of 2026) Regulations, 2026, notification of 30 April 2026; MSERC public notice of 1 October 2026
- MSERC order in Case No. 11 of 2025 (MePDCL distribution tariff for FY 2026-27), dated 26 March 2026
- Meghalaya New And Renewable Energy Development Agency (State Nodal Agency for MNRE); MSERC DRE Regulations, 2026 preamble
- Meghalaya Power Policy 2024 (Power Department, Government of Meghalaya), chapter VII and clauses 1 and 3
- Meghalaya State Electricity Regulatory Commission
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ