Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Thiruvananthapuram, Kerala: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Thiruvananthapuram
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 2240 km from Thiruvananthapuram in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Thiruvananthapuram | about 2240 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Thiruvananthapuram at a glance for solar projects
| District and state | Thiruvananthapuram district, Kerala |
|---|---|
| Electricity supply | KSEB Ltd, the state electricity board company, supplies Thiruvananthapuram district outside the small areas held by special licensees such as industrial parks. |
| Electricity regulator | Kerala State Electricity Regulatory Commission (KSERC) |
| State renewable energy agency | Agency for New and Renewable Energy Research and Technology (ANERT) |
| State solar policy | Kerala Solar Energy Policy, 2013 (G.O.(P) No. 49/2013/PD of 25 November 2013; stays in force until another policy replaces it) |
| Rooftop metering for businesses | Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage) |
| Modelled solar output | about 1,440 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 2240 km from Thiruvananthapuram in a straight line |
Net metering for a house in Thiruvananthapuram
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
KSEB Ltd, the state electricity board company, supplies Thiruvananthapuram district outside the small areas held by special licensees such as industrial parks.
Metering for shops, offices and factories in Thiruvananthapuram
In Kerala an industrial consumer can install rooftop or other solar of 1 kW to 500 kW under net metering, within the connected load or contract demand. Larger plants go under net billing (up to 1,000 kW, or 3,000 kW with storage) or gross metering (up to 3,000 kW). The rules are in the KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified on 5 November 2025. They replaced the 2020 net metering regulations, and KSERC's list shows no later amendment.
The size limits, charges and other conditions for Kerala are on the page Solar Panel Installation in Kerala.
In Thiruvananthapuram the application for connection and metering goes to KSEB.
What a rooftop system produces in Thiruvananthapuram
A solar plant in Thiruvananthapuram is modelled to produce about 1,440 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,320 units | 30 sq m |
| 5 kW | 7,200 units | 50 sq m |
| 10 kW | 14,400 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Thiruvananthapuram
The Government of India's One District One Product (ODOP) list names Handloom Products as the product of Thiruvananthapuram district.
Subsidy for houses in Thiruvananthapuram
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Thiruvananthapuram.
Rooftop installations by Somaya Solar near Thiruvananthapuram
These are the Somaya Solar projects closest to Thiruvananthapuram, with straight-line distances. They are shown as references and are not in Thiruvananthapuram unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 2180 km from Thiruvananthapuram. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 2310 km from Thiruvananthapuram. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 2390 km from Thiruvananthapuram. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Thiruvananthapuram
Which electricity company handles solar connections in Thiruvananthapuram?
KSEB Ltd, the state electricity board company, supplies Thiruvananthapuram district outside the small areas held by special licensees such as industrial parks.
Is net metering available for factories and commercial buildings in Thiruvananthapuram?
Net metering up to 500 kW for industrial consumers; net billing up to 1 MW (3 MW with storage). The rule is the same across Kerala.
How much solar subsidy can a house in Thiruvananthapuram get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Thiruvananthapuram?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Thiruvananthapuram?
About 4,320 units a year, or about 360 a month on average, by the PVGIS model for Thiruvananthapuram. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Thiruvananthapuram?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Thiruvananthapuram?
About 1,440 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.4 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Thiruvananthapuram?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 2240 km from Thiruvananthapuram in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 2180 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Thiruvananthapuram
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- ANERT website, Overview page (the name is in Malayalam script there); Kerala Solar Energy Policy 2013 names ANERT as the nodal agency for non-conventional energy
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified 5 November 2025
- KSERC (Renewable Energy and Related Matters) Regulations, 2025, notified 5 November 2025 (Gazette 6 November 2025)
- KSERC order of 21 May 2026 in OP 63/2025 (KSEB Ltd true-up), para 5.1
- Kerala Local Self Government Department, Urban Affairs Department page (list of corporations and municipalities with district)
- Kerala Solar Energy Policy 2013 (G.O.(P) No. 49/2013/PD, 25 November 2013), as published by ANERT
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ