Solar Panel Installation in Rudrapur

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Rudrapur, Uttarakhand: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Rudrapur

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 190 km from Rudrapur in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Rudrapurabout 190 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Rudrapur at a glance for solar projects

District and stateUdham Singh Nagar district, Uttarakhand
Electricity supplyUttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Udham Singh Nagar district.
Electricity regulatorUttarakhand Electricity Regulatory Commission (UERC)
State renewable energy agencyUttarakhand Renewable Energy Development Agency (UREDA)
State solar policyUttarakhand State Solar Policy, 2023 (in force until another policy replaces it; targets run to December 2027)
Rooftop metering for businessesNet metering up to 1 MW, within the sanctioned load
Modelled solar outputabout 1,390 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 190 km from Rudrapur in a straight line

Net metering for a house in Rudrapur

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Udham Singh Nagar district.

Metering for shops, offices and factories in Rudrapur

In Uttarakhand, a commercial or industrial consumer of UPCL can install rooftop or small solar under net metering up to 100% of the sanctioned load or contract demand, with a ceiling of 1 MW. The rule is in Regulation 37 of the regulator's renewable energy regulations of 2023, as rewritten by the first amendment of 20 June 2024.

The size limits, charges and other conditions for Uttarakhand are on the page Solar Panel Installation in Uttarakhand.

In Rudrapur the application for connection and metering goes to UPCL.

What a rooftop system produces in Rudrapur

A solar plant in Rudrapur is modelled to produce about 1,390 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.

Plant sizeModelled output a yearShadow-free roof needed (typical)
3 kW4,170 units30 sq m
5 kW6,950 units50 sq m
10 kW13,900 units100 sq m
100 kW1.4 lakh units1,000 sq m

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Rudrapur: industrial areas

The district administration describes Udham Singh Nagar as an agro-industrial district, with SIIDCUL's Integrated Industrial Estates at Pantnagar and Sitarganj.

The Government of India's One District One Product (ODOP) list names Moonj Grass product as the product of Udham Singh Nagar district.

Subsidy for houses in Rudrapur

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Rudrapur.

Rooftop installations by Somaya Solar near Rudrapur

These are the Somaya Solar projects closest to Rudrapur, with straight-line distances. They are shown as references and are not in Rudrapur unless the line says so.

  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 50 km from Rudrapur. Completed in two months, with five years of operation and maintenance.
  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 130 km from Rudrapur. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 160 km from Rudrapur. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Rudrapur

Which electricity company handles solar connections in Rudrapur?

Uttarakhand Power Corporation Limited (UPCL) is the sole distribution licensee for the whole of Uttarakhand, so it supplies Udham Singh Nagar district.

Is net metering available for factories and commercial buildings in Rudrapur?

Net metering up to 1 MW, within the sanctioned load. The rule is the same across Uttarakhand.

How much solar subsidy can a house in Rudrapur get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Rudrapur?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Rudrapur?

About 4,170 units a year, or about 348 a month on average, by the PVGIS model for Rudrapur. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Rudrapur?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

How much electricity does a solar plant generate in Rudrapur?

About 1,390 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.9 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Rudrapur?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 190 km from Rudrapur in a straight line. The closest published project is Naini Papers Limited (3 MW rooftop plant) in Kashipur, about 50 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Rudrapur

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image