Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Mokokchung, Nagaland: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Mokokchung
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1700 km from Mokokchung in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Mokokchung | about 1700 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Mokokchung at a glance for solar projects
| District and state | Mokokchung district, Nagaland |
|---|---|
| Electricity supply | Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mokokchung district. |
| Electricity regulator | Nagaland Electricity Regulatory Commission (NERC) |
| State renewable energy agency | Department of Power, Nagaland (DoPN) |
| State solar policy | Nagaland renewable policy is named on a department menu but no document is linked |
| Rooftop metering for businesses | Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load |
| Modelled solar output | about 1,160 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1700 km from Mokokchung in a straight line |
Net metering for a house in Mokokchung
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mokokchung district.
Metering for shops, offices and factories in Mokokchung
In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.
The size limits, charges and other conditions for Nagaland are on the page Solar Panel Installation in Nagaland.
In Mokokchung the application for connection and metering goes to DoPN.
What a rooftop system produces in Mokokchung
A solar plant in Mokokchung is modelled to produce about 1,160 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 3,480 units | 30 sq m |
| 5 kW | 5,800 units | 50 sq m |
| 10 kW | 11,600 units | 100 sq m |
| 100 kW | 1.2 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Mokokchung
The Government of India's One District One Product (ODOP) list names Coffee, Tea, Banana and Ginger as the products of Mokokchung district.
Subsidy for houses in Mokokchung
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Mokokchung.
Rooftop installations by Somaya Solar near Mokokchung
These are the Somaya Solar projects closest to Mokokchung, with straight-line distances. They are shown as references and are not in Mokokchung unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1460 km from Mokokchung. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1560 km from Mokokchung. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1650 km from Mokokchung. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Mokokchung
Which electricity company handles solar connections in Mokokchung?
Department of Power, Government of Nagaland (DoPN) is the distribution utility for Nagaland and supplies Mokokchung district.
Is net metering available for factories and commercial buildings in Mokokchung?
Net or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load. The rule is the same across Nagaland.
How much solar subsidy can a house in Mokokchung get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Mokokchung?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Mokokchung?
About 3,480 units a year, or about 290 a month on average, by the PVGIS model for Mokokchung. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Mokokchung?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Mokokchung?
About 1,160 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Mokokchung?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1700 km from Mokokchung in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1460 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Mokokchung
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of New and Renewable Energy, Nagaland (Policies menu); NERC rooftop regulations amendment of 29 Mar 2025
- Department of Power, Nagaland: Operational Guidelines for PM-Surya Ghar: Muft Bijli Yojana in Nagaland, which names DoPN as the Nodal Agency for rooftop solar under that scheme
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MoHUA PMAY-Urban, List of ULBs (columns: State | District Code | District Name | City Code | Name of City | ULB Type; undated)
- NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019, with the First Amendment of 20 May 2024 and the Second Amendment of 29 March 2025
- NERC tariff order dated 17 September 2026, introduction item (d)
- Nagaland Electricity Regulatory Commission (NERC), Kohima
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ