Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Nagaland: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Nagaland

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Nagaland at a glance for solar projects

Electricity regulatorNagaland Electricity Regulatory Commission (NERC)
State renewable energy agencyDepartment of Power, Nagaland (DoPN)
Electricity distributionDoPN (The whole state of Nagaland, including Kohima and Dimapur)
State solar policyNagaland renewable policy is named on a department menu but no document is linked
Rooftop metering for businessesNet or gross metering, 1 kWp to 500 kWp, up to 100% of sanctioned load

Net metering for a house in Nagaland

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Nagaland

In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.

  • An eligible consumer may install a system under net metering or gross metering. Under net metering the consumer uses the power at the premises and injects the surplus. Under gross metering all the power is sold to the distribution licensee.
  • The system may not exceed 100% of the connected load, sanctioned load or contract demand. It must be at least 1 kWp and at most 500 kWp.
  • The total rooftop capacity fed from one distribution transformer may not exceed 100% of that transformer's capacity.
  • Credits left unused at the end of the settlement period are treated as units bought by the distribution licensee at a rate that the Department of Power proposes and the Commission approves (Second Amendment, 29 March 2025). The 2019 text had treated them as inadvertent injection that was not paid for. No approved rate for 2026-27 was found.
  • The consumer still pays the monthly minimum charge, whatever the credit balance. Rooftop systems are exempt from wheeling, cross-subsidy, transmission and distribution and banking charges.
  • Group net metering is provided for, and a third party that leases rooftops may install a system. The regulations do not stop the State from setting up systems above 500 kW through another route.
  • The First Amendment of 20 May 2024 requires the technical feasibility study within 15 days, failing which the proposal is presumed feasible. Applications up to 10 kW are deemed accepted without a study.

What a rooftop system produces in Nagaland

Solar output changes across Nagaland with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,080 to 1,260 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Chumukedima1,2101,280
Dimapur1,2101,280
Kohima1,2601,330
Longleng1,1501,210
Mokokchung1,1601,220
Mon1,0801,140
Tuensang1,1401,190
Wokha1,1801,230
Zunheboto1,1801,250

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Nagaland

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Nagaland.

Questions about solar projects in Nagaland

Is net metering available for factories and commercial buildings in Nagaland?

In Nagaland, grid-connected rooftop solar for all consumers falls under the NERC (Rooftop Solar Grid Interactive System Net/Gross Metering) Regulations, 2019. NERC amended them on 20 May 2024 and again on 29 March 2025.

How much solar subsidy can a house in Nagaland get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Nagaland?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Nagaland?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Nagaland

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image