Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Kurnool, Andhra Pradesh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Kurnool
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1430 km from Kurnool in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Kurnool | about 1430 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Kurnool at a glance for solar projects
| District and state | Kurnool district, Andhra Pradesh |
|---|---|
| Electricity supply | Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Kurnool district, one of the districts it lists as its area. |
| Electricity regulator | Andhra Pradesh Electricity Regulatory Commission (APERC) |
| State renewable energy agency | New & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) |
| State solar policy | Andhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024) |
| Rooftop metering for businesses | Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand |
| Modelled solar output | about 1,360 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1430 km from Kurnool in a straight line |
Net metering for a house in Kurnool
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Kurnool district, one of the districts it lists as its area.
Metering for shops, offices and factories in Kurnool
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
The size limits, charges and other conditions for Andhra Pradesh are on the page Solar Panel Installation in Andhra Pradesh.
In Kurnool the application for connection and metering goes to APSPDCL.
What a rooftop system produces in Kurnool
A solar plant in Kurnool is modelled to produce about 1,360 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,080 units | 30 sq m |
| 5 kW | 6,800 units | 50 sq m |
| 10 kW | 13,600 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Kurnool: industrial areas
APIIC, the Andhra Pradesh Industrial Infrastructure Corporation, lists Bpcl-Kurnool, Ie_Kurnool, Ie_Kurnool_Exp_Ph_I, Ie_Kurnool_Expn_Iii, IP-Kurnool Mega Industrial Hub and Seie-Kurnool among its industrial areas in Kurnool district.
The Government of India's One District One Product (ODOP) list names Stone carved products, Kodumuru Gadwal Sarees and Yemmiganuru Bedsheets as the products of Kurnool district.
Subsidy for houses in Kurnool
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Kurnool.
Rooftop installations by Somaya Solar near Kurnool
These are the Somaya Solar projects closest to Kurnool, with straight-line distances. They are shown as references and are not in Kurnool unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1350 km from Kurnool. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1490 km from Kurnool. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1570 km from Kurnool. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Kurnool
Which electricity company handles solar connections in Kurnool?
Southern Power Distribution Company of Andhra Pradesh Limited (APSPDCL) supplies electricity in Kurnool district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Kurnool?
Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand. The rule is the same across Andhra Pradesh.
How much solar subsidy can a house in Kurnool get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Kurnool?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Kurnool?
About 4,080 units a year, or about 340 a month on average, by the PVGIS model for Kurnool. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Kurnool?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Kurnool?
About 1,360 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.6 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Kurnool?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1430 km from Kurnool in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1350 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Kurnool
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026
- APIIC, List of APIIC Industrial Parks, Undeveloped Lands (UDL) & Private Industrial Parks in Andhra Pradesh
- APSPDCL recruitment notification, 24 June 2026
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MoHUA PMAY-Urban, "Details of Urban Local bodies and Areas under ..." (List-of-ULB.pdf), row: State | District code | District | City code | ULB name | ULB type
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ