Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Andhra Pradesh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Andhra Pradesh
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Andhra Pradesh at a glance for solar projects
| Electricity regulator | Andhra Pradesh Electricity Regulatory Commission (APERC) |
|---|---|
| State renewable energy agency | New & Renewable Energy Development Corporation of Andhra Pradesh Limited (NREDCAP) |
| Electricity distribution | APSPDCL (Nine districts in the south and the Rayalaseema: SPSR Nellore, Tirupati, Chittoor, Annamayya, YSR Kadapa, Nandyal, Kurnool, Ananthapuramu and Sri Sathya Sai. Head office in Tirupati.); APCPDCL (NTR, Krishna, Guntur, Palnadu, Bapatla, Prakasam and Markapuram districts, plus eight mandals of Eluru district: Kaikaluru, Kalidindi, Mandavalli, Mudinepalli, Agiripalli, Chatrai, Musunuru and Nuzvidu. Head office in Vijayawada.); APEPDCL (The north-east coast: Srikakulam, Vizianagaram, Parvathipuram Manyam, Visakhapatnam, Anakapalli, Alluri Sitharamaraju, Kakinada, East Godavari, Dr B.R. Ambedkar Konaseema, West Godavari and Eluru districts (the eight Eluru mandals above are APCPDCL). Head office in Visakhapatnam.) |
| State solar policy | Andhra Pradesh Integrated Clean Energy Policy, 2024 (G.O.Ms.No.37, 30 October 2024) |
| Rooftop metering for businesses | Net metering up to 500 kWp; net billing up to 1,000 kWp; each within contracted demand |
Net metering for a house in Andhra Pradesh
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Andhra Pradesh
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
- Net metering: up to 500 kWp, or the contracted demand if that is lower.
- Net billing or net feed-in: up to 1,000 kWp, or the contracted demand if that is lower.
- Gross metering: up to 5,000 kWp, or the contracted demand if that is lower. Larger plants can be set up as captive plants under section 9 of the Electricity Act, 2003.
- Group net metering and virtual net metering are allowed from 5 kWp to 500 kWp.
- Plant capacity is counted in DC (kWp), not inverter capacity.
- The total rooftop capacity on one distribution transformer may not exceed 80% of its rated capacity, and 100% of the feeder capacity.
What a rooftop system produces in Andhra Pradesh
Solar output changes across Andhra Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,310 to 1,400 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Anantapur | 1,400 | 1,420 |
| Guntur | 1,330 | 1,340 |
| Kadapa | 1,360 | 1,370 |
| Kakinada | 1,370 | 1,390 |
| Kurnool | 1,360 | 1,380 |
| Nandyal | 1,340 | 1,360 |
| Nellore | 1,370 | 1,370 |
| Ongole | 1,370 | 1,380 |
| Rajamahendravaram | 1,330 | 1,350 |
| Tirupati | 1,350 | 1,350 |
| Vijayawada | 1,310 | 1,320 |
| Visakhapatnam | 1,380 | 1,400 |
| Vizianagaram | 1,360 | 1,380 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Andhra Pradesh
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Andhra Pradesh.
Questions about solar projects in Andhra Pradesh
Is net metering available for factories and commercial buildings in Andhra Pradesh?
These are the rooftop limits as APERC finalised them in its order of 22 February 2024 on the Grid Interactive Solar Rooftop Photovoltaic System (Gross/Net Metering) Regulation, 2023. Check later amendments with the distribution company before relying on them.
How much solar subsidy can a house in Andhra Pradesh get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Andhra Pradesh?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Andhra Pradesh?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Andhra Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- APERC final order dated 22 February 2024 on the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023)
- APERC retail supply tariff order for FY 2026-27, dated 25 March 2026
- APSPDCL recruitment notification of 24 June 2026 (district list); APCPDCL recruitment notification of 25 June 2026 (district list and Eluru mandals); APEPDCL website contacts menu (https://www.apeasternpower.com/districtMap); APERC tariff order for FY 2026-27, dated 25 March 2026 (names the three licensees)
- G.O.Ms.No.26, Energy (Power-II) Department, 28 February 2025, operational guidelines for the Andhra Pradesh Integrated Clean Energy Policy, 2024
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ