Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Koch Bihar, West Bengal: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Koch Bihar
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1210 km from Koch Bihar in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Koch Bihar | about 1210 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Koch Bihar at a glance for solar projects
| District and state | Cooch Behar district, West Bengal |
|---|---|
| Electricity supply | West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Cooch Behar district, one of the districts it lists as its area. |
| Electricity regulator | West Bengal Electricity Regulatory Commission (WBERC) |
| State renewable energy agency | West Bengal Renewable Energy Development Agency (WBREDA) |
| State solar policy | No current West Bengal solar policy confirmed; the regulator lists only a 2012 renewable energy policy |
| Rooftop metering for businesses | Net metering up to 500 kW; net billing and gross metering up to the contract demand |
| Modelled solar output | about 1,150 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1210 km from Koch Bihar in a straight line |
Net metering for a house in Koch Bihar
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Cooch Behar district, one of the districts it lists as its area.
Metering for shops, offices and factories in Koch Bihar
In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.
The size limits, charges and other conditions for West Bengal are on the page Solar Panel Installation in West Bengal.
In Koch Bihar the application for connection and metering goes to WBSEDCL.
What a rooftop system produces in Koch Bihar
A solar plant in Koch Bihar is modelled to produce about 1,150 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 3,450 units | 30 sq m |
| 5 kW | 5,750 units | 50 sq m |
| 10 kW | 11,500 units | 100 sq m |
| 100 kW | 1.1 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Koch Bihar: industrial areas
WBIIDC, the West Bengal Industrial Infrastructure Development Corporation, lists Coochbehar Industrial Park: Phase I and Coochbehar Industrial Park: Phase II among its industrial areas in Cooch Behar district.
The Government of India's One District One Product (ODOP) list names Sital pati & its products and Mekhla dress materials as the products of Cooch Behar district.
Subsidy for houses in Koch Bihar
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Koch Bihar.
Rooftop installations by Somaya Solar near Koch Bihar
These are the Somaya Solar projects closest to Koch Bihar, with straight-line distances. They are shown as references and are not in Koch Bihar unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 960 km from Koch Bihar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1080 km from Koch Bihar. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1180 km from Koch Bihar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Koch Bihar
Which electricity company handles solar connections in Koch Bihar?
West Bengal State Electricity Distribution Company Limited (WBSEDCL) supplies electricity in Cooch Behar district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Koch Bihar?
Net metering up to 500 kW; net billing and gross metering up to the contract demand. The rule is the same across West Bengal.
How much solar subsidy can a house in Koch Bihar get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Koch Bihar?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Koch Bihar?
About 3,450 units a year, or about 288 a month on average, by the PVGIS model for Koch Bihar. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Koch Bihar?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Koch Bihar?
About 1,150 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 11.5 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Koch Bihar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1210 km from Koch Bihar in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 960 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Koch Bihar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Department of Urban Development & Municipal Affairs, West Bengal: Urban Local Bodies (columns: Sl. | Name | District | ...)
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ
- WBERC (Grid Interactive Rooftop Solar Photovoltaic System for Prosumers) Regulations, 2025, Notification No. 81/WBERC, Kolkata Gazette of 31 July 2025; WBERC suo-motu order SM-40/25-26 of 20 August 2025 (feed-in tariff)
- WBIIDC (West Bengal Industrial Infrastructure Development Corporation): Industrial Parks
- WBSEDCL annual report 2024-25 (Management Discussion and Analysis), list of regional offices
- West Bengal Electricity Regulatory Commission
- West Bengal Electricity Regulatory Commission, Policies > State page (read 18-19 Nov 2026), and the 2012 policy it hosts
- West Bengal Renewable Energy Development Agency, home page (describes WBREDA as the State Nodal Agency for non-conventional energy programmes)