Solar Panel Installation in West Bengal

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in West Bengal: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in West Bengal

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

West Bengal at a glance for solar projects

Electricity regulatorWest Bengal Electricity Regulatory Commission (WBERC)
State renewable energy agencyWest Bengal Renewable Energy Development Agency (WBREDA)
Electricity distributionWBSEDCL (Most of West Bengal, with more than 2.03 crore customers across the state. Since 1 January 2019 it also supplies the former Durgapur Projects Limited (DPL) area in Durgapur.); CESC (Kolkata and some areas in the districts of Howrah, Hooghly, North 24 Parganas and South 24 Parganas); IPCL (About 798 sq. km in the Asansol-Raniganj industrial belt); DVC (Retail supply to consumers in the part of the Damodar Valley area that lies in West Bengal)
State solar policyNo current West Bengal solar policy confirmed; the regulator lists only a 2012 renewable energy policy
Rooftop metering for businessesNet metering up to 500 kW; net billing and gross metering up to the contract demand

Net metering for a house in West Bengal

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in West Bengal

In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.

  • The total rooftop capacity on a feeder or distribution transformer may not exceed 100% of its capacity.
  • An HT consumer may connect the plant at its LT bus bar, but the net meter must be on the HT side of the consumer's transformer.
  • Each licensee must allow net metering at least up to a yearly quota. For WBSEDCL it is 100 MW in 2025-26 and 195 MW in 2026-27; for CESC 25 MW and 50 MW; for DVC 25 MW and 50 MW; for IPCL 5 MW in each year. Applications are taken first come, first served.
  • Under net metering, surplus units carry forward from bill to bill and lapse at the end of the settlement period, which runs from 1 April to 31 March. A consumer on time-of-day tariff has generation set off against consumption in the same time block.
  • Under net billing and gross metering, exported or generated energy is paid at a feed-in tariff set by WBERC. For 2025-26 WBERC set WBSEDCL's feed-in tariff at ₹3.89 per unit at HV, ₹3.73 at EHV and ₹4.37 at LT and MV. The rate agreed in the agreement holds for the life of the plant.
  • Under net billing any credit left at the end of the financial year is reset to zero. Under gross metering the licensee pays out the credit at the end of the settlement period.
  • The application fee is ₹5,000 for HV and EHV consumers. Above 10 kW the licensee must finish a technical feasibility study within 15 days, or the proposal is treated as feasible, and the consumer pays any network upgrade cost.
  • The regulations do not provide for group or virtual net metering.

What a rooftop system produces in West Bengal

Solar output changes across West Bengal with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,010 to 1,350 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Adra1,3301,380
Alipur Duar1,1501,220
Asansol1,3201,380
Bagula1,2801,330
Baharampur1,2801,340
Balarampur1,3301,380
Balurghat1,2301,300
Bankura1,3201,370
Baranagar1,2701,320
Barddhaman1,3001,350
Beldanga1,2801,340
Bhadreswar1,2701,320
Bishnupur1,3101,360
Bolpur1,3001,350
Budge Budge1,2801,330
Chandrakona1,2901,340
Contai1,3501,390
Cooper's Camp1,2801,330
Dam Dam1,2701,320
Darjeeling1,0101,050
Dhulian1,2801,350
Dhupgari1,1101,180
Dinhata1,1701,240
Dubrajpur1,3001,360
Durgapur1,3101,360
Egra1,3401,380
Falakata1,1101,180
Gangarampur1,2201,290
Ghatal1,2901,340
Guskhara1,3001,360
Haldia1,2901,340
Howrah1,2701,320
Islampur1,2001,280
Jalpaiguri1,1301,200
Jangipur1,2901,350
Jhargram1,3001,350
Kalimpong1,0901,150
Kaliyaganj1,2201,290
Kalna1,2801,330
Kalyani1,2801,330
Kamarhati1,2701,320
Kandi1,2901,340
Katoya1,2901,340
Kharagpur1,3001,340
Koch Bihar1,1501,220
Kolkata1,2701,320
Krishnanagar1,2801,340
Kurseong1,0901,150
Maheshtala1,2701,320
Mainaguri1,1201,190
Malda1,2601,330
Matabhanga1,1501,220
Medinipur1,3001,340
Memari1,2901,340
Murshidabad1,2801,340
Nalhati1,2801,340
Navadwip1,2801,330
Puruliya1,3401,390
Raghunathpur1,3301,380
Raiganj1,2301,300
Rampur Hat1,2901,340
Ranaghat1,2801,330
Sainthia1,3001,350
Sankrail1,2801,320
Shantipur1,2801,330
Siliguri1,1501,220
Siuri1,3001,350
Sonamukhi1,3101,360
Tamluk1,2801,330
Titagarh1,2701,320
Tufanganj1,1501,220

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in West Bengal

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in West Bengal.

Questions about solar projects in West Bengal

Is net metering available for factories and commercial buildings in West Bengal?

In West Bengal, rooftop solar for every consumer category is governed by WBERC's Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025, notified on 31 July 2025. A consumer may choose net metering, net billing or gross metering. Net metering is allowed from 1 kW up to 500 kW, or up to the contract demand or sanctioned load, whichever is lower. Net billing and gross metering are allowed up to the contract demand or sanctioned load. WBERC lists no amendment to these regulations.

How much solar subsidy can a house in West Bengal get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in West Bengal?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in West Bengal?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in West Bengal

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image