Somaya Solar Solutions Limited installs solar panels for homes in Kheralu, Gujarat: grid-connected rooftop systems of 1 kW and above, with the PM Surya Ghar subsidy and net metering handled with you.

Which size of home solar system for Kheralu

The National Portal suggests the size from the monthly units on the bill. The output column is the PVGIS model for Kheralu (rooftop array at a 10° tilt, cautious loss settings); the roof column follows the rule of thumb UPNEDA gives, about 10 sq m for each kW.

SizeSuits a monthly use ofModelled output in KheraluShadow-free roofCentral subsidy
1 kWup to 150 units1,420 units a year (about 118 a month)10 sq m₹30,000
2 kWup to 150 units, or 150 to 3002,840 units a year (about 237 a month)20 sq m₹60,000
3 kW150 to 300 units4,260 units a year (about 355 a month)30 sq m₹78,000
5 kWmore than 300 units7,100 units a year (about 592 a month)50 sq m₹78,000 (the cap)
10 kWmore than 300 units: a large house, or one with EV charging14,200 units a year (about 1,183 a month)100 sq m₹78,000 (the cap)

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy on a home solar system in Kheralu

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Kheralu.

What a home solar system from Somaya Solar includes

A grid-connected rooftop system for a house has four parts. All four are supplied, installed and commissioned by us.

  • Solar modules sized to your roof and your monthly units
  • A grid-tied inverter with remote monitoring
  • A hot-dip galvanised mounting structure, made by us
  • Cables, earthing, lightning protection and the bidirectional (net) meter
  • The subsidy application, vendor formalities and the net metering agreement on the National Portal, done with you
  • Annual cleaning and maintenance, where contracted

Net metering and your bill in Kheralu

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Uttar Gujarat Vij Company Limited (UGVCL) supplies electricity in Mahesana district, one of the districts it lists as its area.

How a home installation runs in Kheralu

The scheme is demand-driven: any residential consumer with a grid connection from the local distribution company can apply on the National Portal (pmsuryaghar.gov.in). The process is online from registration to the subsidy reaching the consumer's bank account.

  1. Register on the National Portal with the electricity connection number and apply for the system size
  2. Approval from the electricity supplier (UGVCL): technical feasibility is waived, and the sanctioned load is raised automatically up to 10 kW
  3. Choose a registered vendor and have the system installed
  4. Net metering: the agreement is part of the application, and the bidirectional meter is installed by the electricity supplier (UGVCL)
  5. Commissioning report on the portal, then the subsidy is paid directly into the bank account
  6. Help line 15555 (12 languages); collateral-free loans at 6% a year over 10 years from nationalised banks

Uttar Gujarat Vij Company Limited (UGVCL) supplies electricity in Mahesana district, one of the districts it lists as its area.

In Kheralu the application for connection and metering goes to UGVCL.

Solar output by month in Kheralu

For a rooftop array in Kheralu the strongest month is May, at about 149 units for each kW installed, and the weakest is August, at about 74. For a ground-mounted array at a 29° tilt the strongest month is March (about 152) and the weakest is August (about 70). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January124151
February124141
March145152
April147141
May149134
June116103
July7871
August7470
September9899
October127140
November115136
December116143

Somaya Solar as your installer in Kheralu

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 720 km from Kheralu in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Kheraluabout 720 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

Rooftop work by Somaya Solar near Kheralu

These are the Somaya Solar projects closest to Kheralu, with straight-line distances. They are shown as references and are not in Kheralu unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 850 km from Kheralu. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 860 km from Kheralu. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 860 km from Kheralu. Completed in two months, with five years of operation and maintenance.

See all published projects

Questions about solar projects in Kheralu

Which electricity company handles solar connections in Kheralu?

Uttar Gujarat Vij Company Limited (UGVCL) supplies electricity in Mahesana district, one of the districts it lists as its area.

How much solar subsidy can a house in Kheralu get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Kheralu?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Kheralu?

About 4,260 units a year, or about 355 a month on average, by the PVGIS model for Kheralu. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

Where is Somaya Solar based, and how far is that from Kheralu?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 720 km from Kheralu in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 850 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Kheralu

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.