Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Karawalnagar, Delhi: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover. A house in Delhi can get up to ₹1,56,000 in subsidy for a 3 kW system: ₹78,000 from the centre and up to ₹78,000 from the Delhi government.
Somaya Solar as your installer in Karawalnagar
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 20 km from Karawalnagar in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Karawalnagar | about 20 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Karawalnagar at a glance for solar projects
| District and state | North East district, Delhi |
|---|---|
| Electricity supply | BSES Yamuna Power Limited (BYPL) supplies Karawalnagar, which the cited source places in its supply area. |
| Electricity regulator | Delhi Electricity Regulatory Commission (DERC) |
| State renewable energy agency | Energy Efficiency and Renewable Energy Management Centre, Department of Power, Government of NCT of Delhi (EE&REM Centre) |
| State solar policy | Delhi Solar Energy Policy, 2023 (notified 14 March 2024; valid until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering from 1 kWp, with plant size linked to the sanctioned load |
| Modelled solar output | about 1,420 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 20 km from Karawalnagar in a straight line |
Net metering for a house in Karawalnagar
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
BSES Yamuna Power Limited (BYPL) supplies Karawalnagar, which the cited source places in its supply area.
Metering for shops, offices and factories in Karawalnagar
In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.
- The 2014 regulations provide net metering only. They have no separate net billing or gross metering arrangement.
- A plant larger than the sanctioned load is allowed if the consumer pays the difference in Service Line cum Development charges.
- Each distribution licensee must offer at least 20% of the rated capacity of a distribution transformer for net-metered plants.
- Surplus units carry forward to the next billing period as energy credit. Credits left at the end of the financial year are paid by the licensee at rates notified by DERC.
- Group net metering is open to all consumers, and since 20 January 2026 virtual net metering is too. A ground-mounted plant under either may be up to 5 times the sanctioned load of the participating consumers, with a maximum of 10 MW. Rooftop plants have no cap. Plants commissioned by 31 March 2027 under these guidelines pay no wheeling charge, banking charge or cross-subsidy surcharge for their useful life.
- Peer-to-peer trading of rooftop solar power is allowed under DERC's 2024 guidelines for consumers and prosumers with a sanctioned load or contract demand of up to 200 kW. Ground-mounted projects are excluded.
- Latest amendment: the Net Metering (Second Amendment) Guidelines of 16 July 2026. The process is now online and in two stages. The licensee must grant connectivity within 25 days for plants above 10 kW, not counting the time the consumer takes to install the plant.
In Karawalnagar the application for connection and metering goes to BYPL.
What a rooftop system produces in Karawalnagar
A solar plant in Karawalnagar is modelled to produce about 1,420 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 4,260 units | 30 sq m |
| 5 kW | 7,100 units | 50 sq m |
| 10 kW | 14,200 units | 100 sq m |
| 100 kW | 1.4 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Karawalnagar
The Government of India's One District One Product (ODOP) list names Apparels (Jackets & Jeans) as the product of North East district.
Subsidy for houses in Karawalnagar
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Delhi adds a state capital subsidy of up to ₹26,000 per kW for systems up to 3 kW, capped at ₹78,000 per consumer, under the Delhi Solar Policy. The full table, the conditions and the application steps are on Solar subsidy in Karawalnagar.
Rooftop installations by Somaya Solar near Karawalnagar
These are the Somaya Solar projects closest to Karawalnagar, with straight-line distances. They are shown as references and are not in Karawalnagar unless the line says so.
- Akums Limited: 2.3 MW rooftop plant, SIDCUL, Haridwar, Uttarakhand, about 160 km from Karawalnagar. In progress. The roof is more than 70 feet above the ground, so material is lifted by several cranes.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 160 km from Karawalnagar. Included net-metering coordination with the local electricity distribution company.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 170 km from Karawalnagar. Completed in two months, with five years of operation and maintenance.
Questions about solar projects in Karawalnagar
Which electricity company handles solar connections in Karawalnagar?
BSES Yamuna Power Limited (BYPL) supplies Karawalnagar, which the cited source places in its supply area.
Is net metering available for factories and commercial buildings in Karawalnagar?
In Delhi, rooftop solar connects under net metering. DERC's Net Metering for Renewable Energy Regulations, 2014 apply to consumers who buy electricity from a distribution licensee, and the solar policy confirms that this includes commercial and industrial consumers. The plant must be at least 1 kWp. Its size is subject to the sanctioned load, the capacity of the service line and the feasibility of connecting to the grid.
How much solar subsidy can a house in Karawalnagar get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Delhi adds a state capital subsidy of up to ₹26,000 per kW for systems up to 3 kW, capped at ₹78,000 per consumer, under the Delhi Solar Policy.
How much roof does a home solar system need in Karawalnagar?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Karawalnagar?
About 4,260 units a year, or about 355 a month on average, by the PVGIS model for Karawalnagar. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Karawalnagar?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Karawalnagar?
About 1,420 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 14.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Karawalnagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 20 km from Karawalnagar in a straight line. The closest published project is Akums Limited (2.3 MW rooftop plant) in SIDCUL, Haridwar, about 160 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Karawalnagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BYPL: source naming Karawalnagar within its supply area
- DERC (Net Metering for Renewable Energy) Regulations, 2014, with the First Amendment Regulations of 26 July 2024, the Net Metering Guidelines as amended to 16 July 2026, the Group and Virtual Net Metering Guidelines, 2019 as amended to 20 January 2026, and the Peer to Peer Energy Transaction Guidelines of 24 June 2024
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- Delhi Electricity Regulatory Commission
- Delhi Gazette Extraordinary Part IV, Revenue Dept notification F.223/SDM-II(HQ)/Land/2025/285 of 25 Dec 2025 (Tables I and II), revenue.delhi.gov.in
- Delhi Solar Energy Policy, 2023 (Delhi Gazette, 14 March 2024) with the First Amendment (10 July 2025) and the Second Amendment (Delhi Gazette, 17 September 2026)
- Delhi Solar Energy Policy, 2023 (Department of Power, Government of NCT of Delhi; Delhi Gazette, 14 March 2024)
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, EE&REM Centre: Delhi State Subsidy (page updated 25 November 2026)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ