Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Brajarajnagar, Odisha: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Brajarajnagar
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1000 km from Brajarajnagar in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Brajarajnagar | about 1000 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Brajarajnagar at a glance for solar projects
| District and state | Jharsuguda district, Odisha |
|---|---|
| Electricity supply | TP Western Odisha Distribution Limited (TPWODL) supplies electricity in Jharsuguda district, one of the districts it lists as its area. |
| Electricity regulator | Odisha Electricity Regulatory Commission (OERC) |
| State renewable energy agency | Odisha Renewable Energy Development Agency (OREDA Limited) (OREDA) |
| State solar policy | Odisha Renewable Energy Policy, 2022 (in force until 31 March 2030 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 500 kW or the sanctioned load, whichever is lower |
| Modelled solar output | about 1,320 units (kWh) a year for each kW installed |
| Somaya Solar office | Ghaziabad, Uttar Pradesh, about 1000 km from Brajarajnagar in a straight line |
Net metering for a house in Brajarajnagar
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
TP Western Odisha Distribution Limited (TPWODL) supplies electricity in Jharsuguda district, one of the districts it lists as its area.
Metering for shops, offices and factories in Brajarajnagar
In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.
The size limits, charges and other conditions for Odisha are on the page Solar Panel Installation in Odisha.
In Brajarajnagar the application for connection and metering goes to TPWODL.
What a rooftop system produces in Brajarajnagar
A solar plant in Brajarajnagar is modelled to produce about 1,320 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.
| Plant size | Modelled output a year | Shadow-free roof needed (typical) |
|---|---|---|
| 3 kW | 3,960 units | 30 sq m |
| 5 kW | 6,600 units | 50 sq m |
| 10 kW | 13,200 units | 100 sq m |
| 100 kW | 1.3 lakh units | 1,000 sq m |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Local points for solar projects in Brajarajnagar
The Government of India's One District One Product (ODOP) list names Aluminium Ingot, Chilly and Ginger as the products of Jharsuguda district.
Subsidy for houses in Brajarajnagar
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Brajarajnagar.
Rooftop installations by Somaya Solar near Brajarajnagar
These are the Somaya Solar projects closest to Brajarajnagar, with straight-line distances. They are shown as references and are not in Brajarajnagar unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 790 km from Brajarajnagar. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 960 km from Brajarajnagar. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1070 km from Brajarajnagar. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Brajarajnagar
Which electricity company handles solar connections in Brajarajnagar?
TP Western Odisha Distribution Limited (TPWODL) supplies electricity in Jharsuguda district, one of the districts it lists as its area.
Is net metering available for factories and commercial buildings in Brajarajnagar?
Net metering up to 500 kW or the sanctioned load, whichever is lower. The rule is the same across Odisha.
How much solar subsidy can a house in Brajarajnagar get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Brajarajnagar?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Brajarajnagar?
About 3,960 units a year, or about 330 a month on average, by the PVGIS model for Brajarajnagar. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Brajarajnagar?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
How much electricity does a solar plant generate in Brajarajnagar?
About 1,320 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.2 lakh units a year. A site study gives the figure to plan on.
Where is Somaya Solar based, and how far is that from Brajarajnagar?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1000 km from Brajarajnagar in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 790 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Brajarajnagar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- DPIIT, ODOP Product List V32 (19 August 2025); copy hosted by the Embassy of India, Algiers
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- OERC common tariff order for TPNODL, TPWODL, TPCODL and TPSODL for 2026-27, 24 March 2026, Table 1 licensed areas (txt-jhod/oerc-discom-order-2627.txt)
- OERC order on Net Metering / Bi-directional Metering of 19 August 2016, as amended up to 17 January 2018, by the order of 5 May 2022 and by the order of 27 November 2025
- OREDA Limited website, About OREDA Limited
- Odisha Electricity Regulatory Commission
- Odisha Housing & Urban Development Department, District Wise ULBs and Population (list of 115 ULBs; saved as html-jhod/odisha-ulb-district.html). Row format: district | municipality or NAC
- Odisha Renewable Energy Policy, 2022 (Energy Department resolution No. 11757 of 30 November 2022, Odisha Gazette Extraordinary No. 3354)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ