Solar Panel Installation in Odisha

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Odisha: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Odisha

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Odisha at a glance for solar projects

Electricity regulatorOdisha Electricity Regulatory Commission (OERC)
State renewable energy agencyOdisha Renewable Energy Development Agency (OREDA Limited) (OREDA)
Electricity distributionTPCODL (Puri, Khurda, Nayagarh, Cuttack, Dhenkanal, Jagatsinghpur, Angul, Kendrapara and some part of Jajpur); TPSODL (Ganjam, Gajapati, Kandhamal, Boudh, Rayagada, Koraput, Nabarangpur and Malkangiri); TPWODL (Sambalpur, Sundargarh, Bolangir, Bargarh, Deogarh, Nuapada, Kalahandi, Sonepur and Jharsuguda); TPNODL (Mayurbhanj, Keonjhar, Bhadrak, Balasore and most of Jajpur)
State solar policyOdisha Renewable Energy Policy, 2022 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering up to 500 kW or the sanctioned load, whichever is lower

Net metering for a house in Odisha

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Odisha

In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.

  • The plant may not be larger than the consumer's contract demand. A consumer who wants a bigger plant must apply to raise the contracted load.
  • The total solar capacity connected to one distribution transformer may not exceed 75% of that transformer's capacity.
  • Gross metering is also defined in the order: all solar energy generated is metered separately from all energy consumed, and the generation is paid at a tariff the Commission fixes.
  • The settlement period ends on 31 March. Excess energy carries forward month to month within the same financial year, with no interest. The energy counted is capped at 90% of the year's consumption, any excess above that is free energy, and nothing carries into the next financial year.
  • Group net metering and virtual net metering were added on 5 May 2022. The capacity under either may not be less than 5 kW or more than 500 kW. The virtual net metering framework applies to Domestic and Specified Public Purpose consumers and to Government and local authority offices.
  • The amendment of 27 November 2025 lets the consumer choose a grid-tied or a hybrid inverter, and the consumer or the distribution company may buy the meter.
  • The application fee is ₹500, and permission is normally issued within 15 days if connection is feasible.

What a rooftop system produces in Odisha

Solar output changes across Odisha with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,270 to 1,390 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Anandpur1,2701,310
Angul1,2701,310
Asika1,3101,340
Balangir1,3201,360
Balasore1,3701,410
Bargarh1,3201,360
Baripada1,3101,360
Barpali1,3201,370
Basudebpur1,3301,370
Baud1,3001,340
Belpahar1,3201,370
Bhadrak1,3301,370
Bhanjanagar1,2801,320
Bhawanipatna1,3101,350
Bhuban1,2801,310
Bhubaneswar1,3001,340
Birmitrapur1,3201,370
Brahmapur1,3601,390
Brajarajnagar1,3201,370
Burla1,3101,360
Chhatrapur1,3901,420
Choudwar1,2901,320
Cuttack1,3001,330
Deogarh1,3201,360
Dhamanagar1,3001,330
Dhenkanal1,2801,320
Gunupur1,2901,320
Hinjilicut1,3501,370
Hirakud1,3101,360
Jagatsinghapur1,3201,350
Jajpur1,3001,330
Jaleshwar1,3501,390
Jatani1,3001,330
Jeypore1,3001,340
Jharsuguda1,3301,380
Joda1,3201,360
Kantabanji1,3301,380
Karanjia1,3001,340
Kendraparha1,3101,350
Keonjhargarh1,3001,340
Khordha1,3001,330
Koraput1,3001,340
Malakanagiri1,2701,300
Paralakhemundi1,3001,330
Patamundai1,3401,370
Patnagarh1,3301,370
Phulbani1,3101,350
Polasara1,3401,360
Puri1,3401,370
Rairangpur1,3101,360
Rajgangpur1,3201,370
Rayagada1,2901,320
Remuna1,3601,400
Rourkela1,3201,370
Sambalpur1,3201,360
Sonepur1,3201,360
Soro1,3301,370
Sunabeda1,3101,340
Sundergarh1,3301,380
Talcher1,2701,310
Titlagarh1,3201,360

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Odisha

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Odisha.

Questions about solar projects in Odisha

Is net metering available for factories and commercial buildings in Odisha?

In Odisha, net metering for rooftop and other solar plants is set by an OERC order of 19 August 2016. The order covers all consumer categories, including industrial and commercial ones. The order has been amended on 17 January 2018, 5 May 2022 and 27 November 2025. Since the May 2022 amendment, net metering is allowed for loads up to 500 kW or the sanctioned load, whichever is lower.

How much solar subsidy can a house in Odisha get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Odisha?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Odisha?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Odisha

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image