Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Bhilai, Chhattisgarh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Bhilai

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 920 km from Bhilai in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Bhilaiabout 920 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Bhilai at a glance for solar projects

District and stateDurg district, Chhattisgarh
Electricity supplyChhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Durg district.
Electricity regulatorChhattisgarh State Electricity Regulatory Commission (CSERC)
State renewable energy agencyChhattisgarh State Renewable Energy Development Agency (CREDA)
State solar policyChhattisgarh State Solar Energy Policy 2017-30 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load or contract demand
Modelled solar outputabout 1,340 units (kWh) a year for each kW installed
Somaya Solar officeGhaziabad, Uttar Pradesh, about 920 km from Bhilai in a straight line

Net metering for a house in Bhilai

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Durg district.

Metering for shops, offices and factories in Bhilai

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

The size limits, charges and other conditions for Chhattisgarh are on the page Solar Panel Installation in Chhattisgarh.

In Bhilai the application for connection and metering goes to CSPDCL.

What a rooftop system produces in Bhilai

A solar plant in Bhilai is modelled to produce about 1,340 units (kWh) a year for each kW installed, for a rooftop array at a 10° tilt.

Plant sizeModelled output a yearShadow-free roof needed (typical)
3 kW4,020 units30 sq m
5 kW6,700 units50 sq m
10 kW13,400 units100 sq m
100 kW1.3 lakh units1,000 sq m

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Local points for solar projects in Bhilai

The Government of India's One District One Product (ODOP) list names Tomato Based Product as the product of Durg district.

Subsidy for houses in Bhilai

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Bhilai.

Rooftop installations by Somaya Solar near Bhilai

These are the Somaya Solar projects closest to Bhilai, with straight-line distances. They are shown as references and are not in Bhilai unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 760 km from Bhilai. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 920 km from Bhilai. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1030 km from Bhilai. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Bhilai

Which electricity company handles solar connections in Bhilai?

Chhattisgarh State Power Distribution Company Limited (CSPDCL) is the state distribution company and supplies Durg district.

Is net metering available for factories and commercial buildings in Bhilai?

Net metering up to 500 kW, within the sanctioned load or contract demand. The rule is the same across Chhattisgarh.

How much solar subsidy can a house in Bhilai get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Bhilai?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Bhilai?

About 4,020 units a year, or about 335 a month on average, by the PVGIS model for Bhilai. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Bhilai?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

How much electricity does a solar plant generate in Bhilai?

About 1,340 units (kWh) a year for each kW installed, by the PVGIS model with cautious loss settings. A 1 MW plant works out to about 13.4 lakh units a year. A site study gives the figure to plan on.

Where is Somaya Solar based, and how far is that from Bhilai?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 920 km from Bhilai in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 760 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Bhilai

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image