Solar Panel Installation in Chhattisgarh

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Chhattisgarh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Chhattisgarh

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Chhattisgarh at a glance for solar projects

Electricity regulatorChhattisgarh State Electricity Regulatory Commission (CSERC)
State renewable energy agencyChhattisgarh State Renewable Energy Development Agency (CREDA)
Electricity distributionCSPDCL (The state distribution company of Chhattisgarh. The regulator sets its retail tariff for the whole state.)
State solar policyChhattisgarh State Solar Energy Policy 2017-30 (in force until 31 March 2030 unless replaced earlier)
Rooftop metering for businessesNet metering up to 500 kW, within the sanctioned load or contract demand

Net metering for a house in Chhattisgarh

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Chhattisgarh

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

  • The plant may not be larger than the consumer's sanctioned load or contract demand. The smallest system is 1 kW.
  • Any consumer in the licensee's area may use net metering, first come first served. One consumer may have two or more systems if they share a single injection point to the grid.
  • Surplus energy offsets the licensee's supply in the billing period. The settlement period runs from 1 April to 31 March, and carried-forward energy resets to zero each April. At the end of the period the licensee buys any excess at the lowest rooftop solar tariff found by competitive bidding in the last financial year.
  • Fixed or demand charges and government levies are still payable. Where the tariff is in kVAh, the readings are taken in kVAh.
  • Net metered systems do not pay wheeling, cross-subsidy, transmission, distribution or banking charges.
  • The rooftop capacity connected to one distribution transformer may not exceed 100% of that transformer's capacity.
  • Group net metering is open to all consumers, up to 500 kW. Virtual net metering, under the guidelines of 22 December 2022, is limited to residential consumers, group housing societies and government or local authority establishments, so it does not cover commercial or industrial consumers.
  • For rooftop systems up to 10 kW, no technical feasibility study is made, and the contract demand is treated as raised if it is below the plant size (Supply Code, Fifth Amendment, 22 August 2025).

What a rooftop system produces in Chhattisgarh

Solar output changes across Chhattisgarh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,320 to 1,340 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Bhilai1,3401,390
Bilaspur1,3401,390
Durg1,3401,390
Korba1,3401,390
Raigarh1,3201,370
Raipur1,3401,390

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Chhattisgarh

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Chhattisgarh.

Questions about solar projects in Chhattisgarh

Is net metering available for factories and commercial buildings in Chhattisgarh?

In Chhattisgarh a consumer of CSPDCL, including a commercial or industrial consumer, can install a rooftop solar system under net metering up to 500 kW. The limit was set by the First Amendment of 8 December 2021 to CSERC's Grid Interactive Distributed Renewable Energy Sources Regulations, 2019. The Second Amendment of 6 October 2023 changed the rules for open access and banking, not this limit. Systems above 500 kW go through the captive or open access route.

How much solar subsidy can a house in Chhattisgarh get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Chhattisgarh?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Chhattisgarh?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Chhattisgarh

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image