Solar Panels for Home in Etawah

Somaya Solar Solutions Limited installs solar panels for homes in Etawah, Uttar Pradesh: grid-connected rooftop systems of 1 kW and above, with the PM Surya Ghar subsidy and net metering handled with you. A house in Uttar Pradesh can get up to ₹1,08,000 in subsidy for a 3 kW system: ₹78,000 from the centre and ₹30,000 from the state.

Which size of home solar system for Etawah

The National Portal suggests the size from the monthly units on the bill. The output column is the PVGIS model for Etawah (rooftop array at a 10° tilt, cautious loss settings); the roof column follows the rule of thumb UPNEDA gives, about 10 sq m for each kW.

SizeSuits a monthly use ofModelled output in EtawahShadow-free roofCentral subsidy
1 kWup to 150 units1,400 units a year (about 117 a month)10 sq m₹30,000
2 kWup to 150 units, or 150 to 3002,800 units a year (about 233 a month)20 sq m₹60,000
3 kW150 to 300 units4,200 units a year (about 350 a month)30 sq m₹78,000
5 kWmore than 300 units7,000 units a year (about 583 a month)50 sq m₹78,000 (the cap)
10 kWmore than 300 units: a large house, or one with EV charging14,000 units a year (about 1,167 a month)100 sq m₹78,000 (the cap)

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy on a home solar system in Etawah

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Uttar Pradesh adds a state subsidy of ₹15,000 per kW, up to ₹30,000 per consumer, for private houses, on top of the central amount, so a 3 kW system can get ₹1,08,000 in all. The full table, the conditions and the application steps are on Solar subsidy in Etawah.

What a home solar system from Somaya Solar includes

A grid-connected rooftop system for a house has four parts. All four are supplied, installed and commissioned by us.

  • Solar modules sized to your roof and your monthly units
  • A grid-tied inverter with remote monitoring
  • A hot-dip galvanised mounting structure, made by us
  • Cables, earthing, lightning protection and the bidirectional (net) meter
  • The subsidy application, vendor formalities and the net metering agreement on the National Portal, done with you
  • Annual cleaning and maintenance, where contracted

Net metering and your bill in Etawah

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Etawah district, one of the 21 districts it lists as its area.

How a home installation runs in Etawah

The scheme is demand-driven: any residential consumer with a grid connection from the local distribution company can apply on the National Portal (pmsuryaghar.gov.in). The process is online from registration to the subsidy reaching the consumer's bank account.

  1. Register on the National Portal with the electricity connection number and apply for the system size
  2. Approval from the electricity supplier (DVVNL): technical feasibility is waived, and the sanctioned load is raised automatically up to 10 kW
  3. Choose a registered vendor and have the system installed
  4. Net metering: the agreement is part of the application, and the bidirectional meter is installed by the electricity supplier (DVVNL)
  5. Commissioning report on the portal, then the subsidy is paid directly into the bank account
  6. Help line 15555 (12 languages); collateral-free loans at 6% a year over 10 years from nationalised banks

Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Etawah district, one of the 21 districts it lists as its area.

In Etawah the application for connection and metering goes to DVVNL.

For the Uttar Pradesh state subsidy the application also goes on UPNEDA's solar rooftop portal (upnedasolarrooftopportal.com); net metering is applied for on UPPCL's net metering portal.

Solar output by month in Etawah

For a rooftop array in Etawah the strongest month is May, at about 146 units for each kW installed, and the weakest is July, at about 91. For a ground-mounted array at a 31° tilt the strongest month is March (about 148) and the weakest is July (about 83). A plant that serves a steady load is best checked against the weakest months.

MonthRooftop, 10° tilt (kWh per kW)Ground-mounted, best fixed tilt (kWh per kW)
January111138
February115134
March140148
April144140
May146132
June122108
July9183
August9389
September102104
October121136
November109133
December107136

Somaya Solar as your installer in Etawah

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 260 km from Etawah in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Etawahabout 260 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

Rooftop work by Somaya Solar near Etawah

These are the Somaya Solar projects closest to Etawah, with straight-line distances. They are shown as references and are not in Etawah unless the line says so.

  • KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 150 km from Etawah. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
  • Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 270 km from Etawah. Completed in two months, with five years of operation and maintenance.
  • Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 360 km from Etawah. Included net-metering coordination with the local electricity distribution company.

See all published projects

Questions about solar projects in Etawah

Which electricity company handles solar connections in Etawah?

Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL), the state distribution company with its head office in Agra, supplies electricity in Etawah district, one of the 21 districts it lists as its area.

How much solar subsidy can a house in Etawah get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. Uttar Pradesh adds a state subsidy of ₹15,000 per kW, up to ₹30,000 per consumer, for private houses, on top of the central amount, so a 3 kW system can get ₹1,08,000 in all.

How much roof does a home solar system need in Etawah?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Etawah?

About 4,200 units a year, or about 350 a month on average, by the PVGIS model for Etawah. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

Where is Somaya Solar based, and how far is that from Etawah?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 260 km from Etawah in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 150 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Etawah

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image