Somaya Solar Solutions Limited installs solar panels for homes in Bengaluru, Karnataka: grid-connected rooftop systems of 1 kW and above, with the PM Surya Ghar subsidy and net metering handled with you.
Which size of home solar system for Bengaluru
The National Portal suggests the size from the monthly units on the bill. The output column is the PVGIS model for Bengaluru (rooftop array at a 10° tilt, cautious loss settings); the roof column follows the rule of thumb UPNEDA gives, about 10 sq m for each kW.
| Size | Suits a monthly use of | Modelled output in Bengaluru | Shadow-free roof | Central subsidy |
|---|---|---|---|---|
| 1 kW | up to 150 units | 1,410 units a year (about 118 a month) | 10 sq m | ₹30,000 |
| 2 kW | up to 150 units, or 150 to 300 | 2,820 units a year (about 235 a month) | 20 sq m | ₹60,000 |
| 3 kW | 150 to 300 units | 4,230 units a year (about 352 a month) | 30 sq m | ₹78,000 |
| 5 kW | more than 300 units | 7,050 units a year (about 588 a month) | 50 sq m | ₹78,000 (the cap) |
| 10 kW | more than 300 units: a large house, or one with EV charging | 14,100 units a year (about 1,175 a month) | 100 sq m | ₹78,000 (the cap) |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy on a home solar system in Bengaluru
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Bengaluru.
What a home solar system from Somaya Solar includes
A grid-connected rooftop system for a house has four parts. All four are supplied, installed and commissioned by us.
- Solar modules sized to your roof and your monthly units
- A grid-tied inverter with remote monitoring
- A hot-dip galvanised mounting structure, made by us
- Cables, earthing, lightning protection and the bidirectional (net) meter
- The subsidy application, vendor formalities and the net metering agreement on the National Portal, done with you
- Annual cleaning and maintenance, where contracted
Net metering and your bill in Bengaluru
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Bangalore Electricity Supply Company Limited (BESCOM) supplies electricity in Bengaluru Urban district, one of the districts it lists as its area.
How a home installation runs in Bengaluru
The scheme is demand-driven: any residential consumer with a grid connection from the local distribution company can apply on the National Portal (pmsuryaghar.gov.in). The process is online from registration to the subsidy reaching the consumer's bank account.
- Register on the National Portal with the electricity connection number and apply for the system size
- Approval from the electricity supplier (BESCOM): technical feasibility is waived, and the sanctioned load is raised automatically up to 10 kW
- Choose a registered vendor and have the system installed
- Net metering: the agreement is part of the application, and the bidirectional meter is installed by the electricity supplier (BESCOM)
- Commissioning report on the portal, then the subsidy is paid directly into the bank account
- Help line 15555 (12 languages); collateral-free loans at 6% a year over 10 years from nationalised banks
Bangalore Electricity Supply Company Limited (BESCOM) supplies electricity in Bengaluru Urban district, one of the districts it lists as its area.
In Bengaluru the application for connection and metering goes to BESCOM.
Solar output by month in Bengaluru
For a rooftop array in Bengaluru the strongest month is March, at about 147 units for each kW installed, and the weakest is July, at about 93. For a ground-mounted array at a 17° tilt the strongest month is March (about 148) and the weakest is July (about 90). A plant that serves a steady load is best checked against the weakest months.
| Month | Rooftop, 10° tilt (kWh per kW) | Ground-mounted, best fixed tilt (kWh per kW) |
|---|---|---|
| January | 136 | 144 |
| February | 135 | 140 |
| March | 147 | 148 |
| April | 132 | 130 |
| May | 127 | 122 |
| June | 102 | 98 |
| July | 93 | 90 |
| August | 98 | 96 |
| September | 106 | 105 |
| October | 112 | 115 |
| November | 102 | 106 |
| December | 115 | 121 |
Somaya Solar as your installer in Bengaluru
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 1740 km from Bengaluru in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
| Distance to Bengaluru | about 1740 km in a straight line from our Ghaziabad works |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
Rooftop work by Somaya Solar near Bengaluru
These are the Somaya Solar projects closest to Bengaluru, with straight-line distances. They are shown as references and are not in Bengaluru unless the line says so.
- KRIBHCO: 2 MW rooftop plant, Shahjahanpur, Uttar Pradesh, about 1680 km from Bengaluru. Fertiliser plant; the structures carry a special coating against corrosion. Five years of operation and maintenance.
- Naini Papers Limited: 3 MW rooftop plant, Kashipur, Uttarakhand, about 1810 km from Bengaluru. Completed in two months, with five years of operation and maintenance.
- Luminous: 1 MW rooftop plant, Haridwar, Uttarakhand, about 1890 km from Bengaluru. Included net-metering coordination with the local electricity distribution company.
Questions about solar projects in Bengaluru
Which electricity company handles solar connections in Bengaluru?
Bangalore Electricity Supply Company Limited (BESCOM) supplies electricity in Bengaluru Urban district, one of the districts it lists as its area.
How much solar subsidy can a house in Bengaluru get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Bengaluru?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
How many units will a 3 kW system generate in Bengaluru?
About 4,230 units a year, or about 352 a month on average, by the PVGIS model for Bengaluru. Summer months give more, the monsoon less.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
Where is Somaya Solar based, and how far is that from Bengaluru?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 1740 km from Bengaluru in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 1680 km away.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bengaluru
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BESCOM website, About Us
- GeoNames (place coordinates, CC BY 4.0)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ