Solar Panel Installation in Telangana

Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Telangana: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Telangana

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Telangana at a glance for solar projects

Electricity regulatorTelangana Electricity Regulatory Commission (TGERC)
State renewable energy agencyTelangana Renewable Energy Development Corporation Limited (TGREDCO)
Electricity distributionTGSPDCL (Hyderabad and the areas of the old Ranga Reddy, Nalgonda, Medak and Mahabubnagar districts (the area in its licence; some districts have since been split)); TGNPDCL (Warangal, Khammam, Karimnagar, Nizamabad and Adilabad (the old districts in its licence; some have since been split). It also serves Rajanna Sircilla district, taken over from the Co-operative Electric Supply Society, Sircilla, on a transitional basis.); TGRPDCL (Licensed on 10 July 2026 for farm, lift irrigation, Mission Bhagiratha and municipal or Hyderabad Metro Water supply connections only. It does not serve commercial or industrial consumers, who stay with TGSPDCL or TGNPDCL.)
State solar policyTelangana Clean and Green Energy Policy, 2025 (G.O.Ms.No.2 of 11 January 2025, in operation for 10 years)
Rooftop metering for businessesNet metering up to 500 kWp and gross metering up to 1 MWp, within 80% of sanctioned load for industrial and commercial consumers

Net metering for a house in Telangana

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Telangana

In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.

  • The 2025 regulation repealed the earlier Regulation No. 6 of 2016 (net metering) and its amendments. Existing net metering users above 500 kWp keep net metering.
  • Under net metering, if a consumer exports more than it imports in a billing period, the excess units are paid at the lowest tariff of the solar power purchase agreements the distribution companies signed in the previous financial year. They are adjusted in the next bill or paid into the consumer's bank account.
  • A TGERC proceeding of 29 December 2025 sets this settlement rate at ₹2.57 per unit, from the date the regulation was notified until the Commission issues a new proceeding.
  • Under gross metering, the distribution company buys all the solar energy at the same rate and bills the consumer separately for all its consumption.
  • Group net metering is open only to domestic (LT-I) consumers and townships and residential colonies, below 100 kWp. Virtual net metering is open to all categories except temporary supply, below 100 kWp, for participating consumers of the same category in the same licensee's area.
  • The total rooftop capacity on one distribution transformer may not exceed 50% of its rated capacity. For HT consumers the same 50% limit applies to the 11 kV or 33 kV feeder's maximum permitted load, or to the substation capacity.
  • The regulation has no net billing arrangement. TGERC's list of final regulations, checked on 18 November 2026, shows no later amendment of it.

What a rooftop system produces in Telangana

Solar output changes across Telangana with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,380 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Hyderabad1,3801,400
Karimnagar1,3601,390
Nizamabad1,3701,400
Ramagundam1,3501,390
Ramgundam1,3501,380
Secunderabad1,3701,400
Warangal1,3401,370

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Telangana

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Telangana.

Questions about solar projects in Telangana

Is net metering available for factories and commercial buildings in Telangana?

In Telangana, a commercial or industrial consumer can install rooftop solar under net metering up to 500 kWp, or under gross metering up to 1 MWp. The plant may not be larger than 80% of the sanctioned load or contracted demand. The rules are in the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025, notified on 15 November 2025.

How much solar subsidy can a house in Telangana get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Telangana?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Telangana?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Telangana

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image