Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Sikkim: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.

Somaya Solar as your installer in Sikkim

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

How we install a rooftop solar system

A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.

  • Site survey: roof type, shadow-free area, structural condition and the route for cables
  • Study of twelve months of bills, to size the plant against your use and your sanctioned load
  • Design and a fixed-price proposal that names the module, inverter and structure
  • Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
  • Supply, mounting, wiring, earthing and lightning protection
  • Testing, meter installation and commissioning, then handover with warranties and monitoring access

Sikkim at a glance for solar projects

Electricity regulatorSikkim State Electricity Regulatory Commission (SSERC)
State renewable energy agencySikkim Renewable Energy Development Agency (SREDA)
Electricity distributionPDS (The whole state of Sikkim, including Gangtok)
State solar policyRooftop Solar Policy for Sikkim 2019: term ended FY 2021-22, no successor found
Rooftop metering for businessesNet metering with banking; capacity 40% of sanctioned load for consumers above 10 kW, up to 500 kWp on 11 kV

Net metering for a house in Sikkim

A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.

Metering for shops, offices and factories in Sikkim

In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.

  • A consumer with a sanctioned connected load above 10 kW may install a system of 40% of the sanctioned load or contract demand, or 10 kW, whichever is higher. A consumer of 10 kW or less may install up to 10 kW.
  • The maximum by supply voltage is 10 kWp on single-phase LT, 20 kWp on three-phase LT and 500 kWp on HT at 11,000 volts.
  • The earlier limits that the total capacity of all systems on one distribution transformer is 30% of its peak capacity, and on one 66/11 or 33/11 kV substation is 30% of its peak capacity, still apply.
  • Net electricity banked at the end of the settlement period, which is the financial year, is paid at 70% of the average power purchase cost approved for the year the system was commissioned. This rate holds for the whole life of the system.
  • Excess energy can be wheeled to other premises of the same owner in the licensee's area. The owner gets 95% of the energy wheeled, and this applies only if the quantity wheeled is more than 500 units a month.
  • A system of up to 10 kW needs no technical feasibility study, and the licensee raises the sanctioned load to match if required. Systems owned by a third party are also covered.

What a rooftop system produces in Sikkim

Solar output changes across Sikkim with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 950 to 1,010 units per kW.

PlaceRooftop, 10° tilt (kWh per kW a year)Ground-mounted, best fixed tilt (kWh per kW a year)
Gangtok1,0101,060
Gyalshing9501,000

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

Subsidy for houses in Sikkim

Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Sikkim.

Questions about solar projects in Sikkim

Is net metering available for factories and commercial buildings in Sikkim?

In Sikkim, rooftop solar for consumers supplied at up to 11,000 volts falls under the SSERC (Grid Interactive Solar PV Systems) Regulations, 2021, notified on 31 December 2021. SSERC amended them on 12 June 2024, 4 September 2024 and 2 May 2025.

How much solar subsidy can a house in Sikkim get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Sikkim?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

How long does a rooftop solar installation take in Sikkim?

The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.

Where is Somaya Solar based?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Sikkim

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.

Certificates & Recognition

Our certifications and recognitions reflect our focus on quality, safety, compliance, and responsible project execution across our solar operations.

Loading Image