Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Rajasthan: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Rajasthan
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Rajasthan at a glance for solar projects
| Electricity regulator | Rajasthan Electricity Regulatory Commission (RERC) |
|---|---|
| State renewable energy agency | Rajasthan Renewable Energy Corporation Limited (RREC) |
| Electricity distribution | JVVNL (Jaipur, Alwar, Bhiwadi, Bharatpur, Kota and the east of the state); AVVNL (Ajmer, Udaipur, Bhilwara, Sikar and the central and southern districts); JdVVNL (Jodhpur, Bikaner, Jaisalmer, Barmer and the west); KEDL (distribution franchisee of JVVNL for Kota city); BkESL (distribution franchisee of JdVVNL for Bikaner city); TPADL (distribution franchisee of AVVNL for Ajmer city); BESL (distribution franchisee of JVVNL for Bharatpur city) |
| State solar policy | Rajasthan Integrated Clean Energy Policy, 2024 (in force until 29 March 2029 unless replaced earlier) |
| Rooftop metering for businesses | Net metering up to 1 MW, within the sanctioned load |
Net metering for a house in Rajasthan
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Rajasthan
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
- Net billing and gross metering are the other arrangements under the same regulations.
- The plant may not be larger than 100% of the consumer's sanctioned load or contract demand.
- The total rooftop capacity connected to one distribution transformer may not exceed 80% of that transformer's capacity.
- Group and virtual net metering were added by the third amendment, notified on 3 December 2025.
- A plant above 1 MW is outside these regulations and goes through the captive or open access route.
What a rooftop system produces in Rajasthan
Solar output changes across Rajasthan with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,340 to 1,560 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Abu | 1,420 | 1,490 |
| Abu Road | 1,410 | 1,480 |
| Ajmer | 1,460 | 1,540 |
| Aklera | 1,380 | 1,450 |
| Alwar | 1,420 | 1,500 |
| Anta | 1,400 | 1,470 |
| Anupgarh | 1,500 | 1,600 |
| Bagru | 1,440 | 1,530 |
| Balotra | 1,490 | 1,570 |
| Bandikui | 1,420 | 1,500 |
| Banswara | 1,380 | 1,450 |
| Baran | 1,400 | 1,470 |
| Barmer | 1,510 | 1,590 |
| Baswa | 1,420 | 1,500 |
| Bayana | 1,420 | 1,500 |
| Beawar | 1,460 | 1,540 |
| Begun | 1,430 | 1,500 |
| Behror | 1,430 | 1,520 |
| Bhadra | 1,470 | 1,560 |
| Bharatpur | 1,420 | 1,500 |
| Bhilwara | 1,440 | 1,510 |
| Bhinmal | 1,450 | 1,520 |
| Bhiwadi | 1,430 | 1,520 |
| Bidasar | 1,490 | 1,580 |
| Bikaner | 1,520 | 1,610 |
| Bilara | 1,470 | 1,550 |
| Bissau | 1,470 | 1,570 |
| Bundi | 1,420 | 1,490 |
| Chaksu | 1,440 | 1,520 |
| Chhabra | 1,390 | 1,450 |
| Chidawa | 1,450 | 1,540 |
| Chittorgarh | 1,430 | 1,500 |
| Churu | 1,480 | 1,570 |
| Dausa | 1,430 | 1,510 |
| Deoli | 1,430 | 1,510 |
| Dhaulpur | 1,410 | 1,480 |
| Dig | 1,420 | 1,500 |
| Dungarpur | 1,420 | 1,480 |
| Falna | 1,450 | 1,520 |
| Fatehnagar | 1,440 | 1,510 |
| Fatehpur | 1,480 | 1,570 |
| Gangapur | 1,420 | 1,500 |
| Gulabpura | 1,450 | 1,520 |
| Hanumangarh | 1,460 | 1,550 |
| Hindaun | 1,420 | 1,500 |
| Jahazpur | 1,430 | 1,500 |
| Jaipur | 1,440 | 1,530 |
| Jaisalmer | 1,560 | 1,650 |
| Jaitaran | 1,460 | 1,540 |
| Jalor | 1,460 | 1,530 |
| Jhalawar | 1,400 | 1,460 |
| Jhalrapatan | 1,400 | 1,460 |
| Jhunjhunun | 1,460 | 1,550 |
| Jodhpur | 1,480 | 1,560 |
| Kaithoon | 1,410 | 1,480 |
| Kaman | 1,420 | 1,500 |
| Kapasan | 1,430 | 1,500 |
| Kapren | 1,410 | 1,480 |
| Karanpur | 1,480 | 1,570 |
| Karauli | 1,420 | 1,490 |
| Kekri | 1,430 | 1,510 |
| Keshorai Patan | 1,420 | 1,490 |
| Khandela | 1,450 | 1,540 |
| Kishangarh | 1,450 | 1,540 |
| Kota | 1,420 | 1,490 |
| Kotputli | 1,430 | 1,520 |
| Kuchera | 1,480 | 1,560 |
| Kumher | 1,420 | 1,500 |
| Lakheri | 1,410 | 1,490 |
| Lalsot | 1,430 | 1,510 |
| Losal | 1,480 | 1,560 |
| Mahwa | 1,420 | 1,500 |
| Malpura | 1,440 | 1,520 |
| Mandal | 1,440 | 1,510 |
| Mandalgarh | 1,430 | 1,510 |
| Mandawa | 1,470 | 1,560 |
| Mangrol | 1,400 | 1,470 |
| Merta | 1,470 | 1,550 |
| Nadbai | 1,420 | 1,500 |
| Nagaur | 1,500 | 1,580 |
| Nasirabad | 1,460 | 1,540 |
| Nathdwara | 1,450 | 1,520 |
| Nawalgarh | 1,460 | 1,550 |
| Neem ka Thana | 1,450 | 1,540 |
| Neemrana | 1,430 | 1,520 |
| Nimbahera | 1,420 | 1,490 |
| Niwai | 1,340 | 1,410 |
| Nohar | 1,470 | 1,570 |
| Nokha | 1,520 | 1,610 |
| Pali | 1,460 | 1,540 |
| Phalodi | 1,540 | 1,620 |
| Pilani | 1,450 | 1,540 |
| Pilibangan | 1,470 | 1,570 |
| Pindwara | 1,430 | 1,500 |
| Pokaran | 1,540 | 1,620 |
| Pratapgarh | 1,400 | 1,460 |
| Pushkar | 1,460 | 1,540 |
| Raisinghnagar | 1,480 | 1,580 |
| Rajakhera | 1,410 | 1,490 |
| Rajaldesar | 1,500 | 1,590 |
| Rajsamand | 1,450 | 1,520 |
| Ramganj Mandi | 1,410 | 1,470 |
| Ratangarh | 1,490 | 1,580 |
| Rawatbhata | 1,420 | 1,490 |
| Rawatsar | 1,470 | 1,560 |
| Sadri | 1,450 | 1,530 |
| Sadulshahar | 1,460 | 1,560 |
| Sagwara | 1,390 | 1,450 |
| Sambhar | 1,460 | 1,540 |
| Sanchor | 1,450 | 1,520 |
| Sangod | 1,400 | 1,470 |
| Sardarshahr | 1,500 | 1,590 |
| Sarwar | 1,440 | 1,520 |
| Sawai Madhopur | 1,410 | 1,490 |
| Sawar | 1,430 | 1,500 |
| Sheoganj | 1,440 | 1,510 |
| Sikar | 1,470 | 1,550 |
| Sirohi | 1,430 | 1,500 |
| Siwana | 1,480 | 1,560 |
| Sojat | 1,460 | 1,540 |
| Sri Dungargarh | 1,500 | 1,590 |
| Sri Ganganagar | 1,470 | 1,560 |
| Sri Madhopur | 1,450 | 1,540 |
| Sujangarh | 1,490 | 1,580 |
| Suket | 1,400 | 1,470 |
| Sumerpur | 1,440 | 1,510 |
| Surajgarh | 1,450 | 1,540 |
| Suratgarh | 1,480 | 1,570 |
| Taranagar | 1,470 | 1,570 |
| Todabhim | 1,420 | 1,490 |
| Todaraisingh | 1,430 | 1,510 |
| Tonk | 1,430 | 1,510 |
| Udaipur | 1,430 | 1,500 |
| Udaipurwati | 1,460 | 1,550 |
| Viratnagar | 1,440 | 1,520 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Rajasthan
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Rajasthan.
Questions about solar projects in Rajasthan
Is net metering available for factories and commercial buildings in Rajasthan?
In Rajasthan, net metering is open to every consumer category, including commercial and industrial, for loads up to 1 MW or up to the sanctioned load or contract demand, whichever is lower. The regulator set this limit in its order of 7 February 2024; before that it was 500 kW.
How much solar subsidy can a house in Rajasthan get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Rajasthan?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Rajasthan?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Rajasthan
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Government of Rajasthan (distribution companies)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- RERC rooftop (grid-interactive distributed renewable energy) regulations, 2021, with amendments to December 2025, and RERC order of 7 February 2024
- Rajasthan Electricity Regulatory Commission
- Rajasthan Integrated Clean Energy Policy, 2024 (Energy Department, Government of Rajasthan)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ