Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Puducherry as an EPC contractor: engineering, supply, construction and commissioning.
What Puducherry's policy says about large solar plants
We could not confirm a current Puducherry solar policy as of November 2026. The Policies page of the Puducherry government portal (updated 12 November 2026) lists no solar or renewable energy policy. A Puducherry Solar Energy Policy of 2015-16 is reported on the REAP website, but that site's security certificate fails, so we could not open it to read its term. Rooftop solar follows the JERC net metering regulations, as the Electricity Department's guidelines say. National schemes (PM Surya Ghar for homes, PM-KUSUM for farmers) apply.
- The Electricity Department's revised rooftop guidelines (January 2024) rest on the JERC (Solar PV Grid Interactive System based on Net Metering) Regulations, 2019.
JERC brought green energy open access into its Connectivity and Open Access Regulations, 2017 through the Third Amendment of 2024, published in the Gazette of India on 19 September 2024. A consumer in Puducherry with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. The 100 kW can be one connection or several connections in the same electricity division.
- Captive consumers have no load limit.
- Banking is allowed within the month or billing cycle, up to 30% of the consumer's monthly consumption from the licensee. The banking charge is 8% of the banked energy, taken in units. Banked energy cannot be carried to the next month; unused energy lapses and the generator gets renewable energy certificates for it.
- For 2026-27 the tariff order sets a cross-subsidy surcharge of ₹1.41 per unit at HT and ₹1.32 per unit at EHT, and an additional surcharge of ₹1.43 per unit. Neither surcharge applies to captive use.
- The additional surcharge is not charged on green energy open access up to the contract demand if the consumer pays fixed charges to the licensee for it.
- The wheeling charge for 2026-27 is ₹0.48 per unit at HT and ₹0.47 per unit at EHT.
- The regulatory surcharge of 10% on energy and demand charges, in force from 1 October 2025, also applies to consumers using open access.
- Standby charges for a green energy open access consumer may not be more than 25% of the energy charge of the consumer's tariff category.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Puducherry
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Puducherry
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 19 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Government of Puducherry portal, Policies page (updated 12-11-2026); Electricity Department rooftop guidelines
- JERC (Connectivity and Open Access in Intra-State Transmission and Distribution) (Third Amendment) Regulations, 2024 (No. JERC-21/2017, notified 13 August 2024, Gazette of India 19 September 2024), and JERC Tariff Order for Puducherry of 24 September 2025