Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Madhya Pradesh: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Madhya Pradesh
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Madhya Pradesh at a glance for solar projects
| Electricity regulator | Madhya Pradesh Electricity Regulatory Commission (MPERC) |
|---|---|
| State renewable energy agency | Office of the Commissioner, New and Renewable Energy, Government of Madhya Pradesh (NRE) |
| Electricity distribution | MPPKVVCL (The areas of the Jabalpur, Rewa, Sagar and Shahdol commissioner divisions); MPMKVVCL (The areas of the Bhopal, Hoshangabad (now Narmadapuram), Gwalior and Chambal commissioner divisions); MPPaKVVCL (The areas of the Indore and Ujjain commissioner divisions); MPIDC (Pithampur SEZ) (The Special Economic Zone at Pithampur, Indore. It supplies power to the units in the zone.); MPIDC (Mohasa-Babai) (The notified Industrial Area Mohasa-Babai in Narmadapuram district (formerly Hoshangabad)) |
| State solar policy | Madhya Pradesh Renewable Energy Policy 2025 (in force for five years from its notification in the State Gazette, or until a new policy replaces it) |
| Rooftop metering for businesses | Net metering up to 500 kW; gross metering up to 1 MW; group and virtual net metering below 100 kW |
Net metering for a house in Madhya Pradesh
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Madhya Pradesh
In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.
- A plant under net metering may not be larger than the consumer's contract demand (demand-based tariff) or sanctioned load (load-based tariff). Group and virtual net metering plants may not exceed the total of the contract demands or sanctioned loads of the parent consumer and the participating consumers.
- Existing net metering consumers with more than 500 kW installed keep the net metering benefit. The smallest plant allowed is 1 kW.
- The total of renewable systems on one distribution transformer may not exceed 80% of its rated capacity. For an HT consumer, the plant may not exceed 80% of the rated capacity of the transformer that supplies the consumer.
- Under net metering, extra energy exported in a billing period is carried forward as credit. The settlement period runs from the first day of the billing month of October to the last day of the billing month of September. Credit left at the end of the period is paid by the DISCOM by 15 November, at the lowest solar or wind tariff discovered in bidding in the state in the preceding financial year.
- A consumer with a net metering or gross metering plant, own or leased from a RESCO, does not pay banking charges, wheeling charges, cross-subsidy surcharge or additional surcharge. The same consumer may not use open access under the state's Intra-State Open Access Regulations.
- A consumer with net metering may not also take gross metering or virtual net metering. Consumers with arrears may not use any of these arrangements.
- The first amendment, notified on 18 June 2026, mainly concerns the PM Surya Ghar Muft Bijli Yojana: no processing fee, no separate agreement (it is signed online with the application) and no meter testing fee for connections under that scheme.
What a rooftop system produces in Madhya Pradesh
Solar output changes across Madhya Pradesh with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,350 to 1,410 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Bhopal | 1,370 | 1,430 |
| Burhanpur | 1,360 | 1,410 |
| Dewas | 1,380 | 1,430 |
| Gwalior | 1,400 | 1,480 |
| Indore | 1,390 | 1,440 |
| Jabalpur | 1,350 | 1,410 |
| Khandwa | 1,370 | 1,420 |
| Morena | 1,410 | 1,490 |
| Murwara | 1,370 | 1,430 |
| Ratlam | 1,380 | 1,450 |
| Rewa | 1,380 | 1,440 |
| Satna | 1,380 | 1,440 |
| Saugor | 1,360 | 1,430 |
| Singrauli | 1,360 | 1,430 |
| Ujjain | 1,380 | 1,440 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Madhya Pradesh
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Madhya Pradesh.
Questions about solar projects in Madhya Pradesh
Is net metering available for factories and commercial buildings in Madhya Pradesh?
In Madhya Pradesh, MPERC's Grid Interactive Renewable Energy Systems regulations of 14 March 2024 let consumers of all categories, including commercial and industrial, install rooftop or on-site renewable plants under net metering up to 500 kW. Gross metering is allowed up to 1 MW. Group net metering and virtual net metering are allowed below 100 kW. The regulations were amended on 18 June 2026. There is no net billing option in these regulations.
How much solar subsidy can a house in Madhya Pradesh get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Madhya Pradesh?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Madhya Pradesh?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh. Its published projects in Madhya Pradesh are: KUSUM-C, Ram Sati Devi (2.4 MW ground-mounted plant under PM-KUSUM Component C, Katni).
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Madhya Pradesh
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Energy Department, Government of Madhya Pradesh: company pages for MP East, Central and West Discom (energy.mp.gov.in/mp-east-discom, /mp-central-discom, /mp-west-discom); MPERC orders of FY 2026-27 for MPIDC Pithampur (Petition 141/2025) and MPIDC Mohasa-Babai (Petition 142/2025)
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- MPERC (Grid Interactive Renewable Energy Systems and Related Matters) Regulations [Revision II], 2024 {RG-39(II) of 2024}, dated 14 March 2024, with the First Amendment of 18 June 2026
- Madhya Pradesh Electricity Regulatory Commission
- Madhya Pradesh Renewable Energy Policy 2025 (New and Renewable Energy Department, Government of Madhya Pradesh), clause 3.4
- Madhya Pradesh Renewable Energy Policy 2025 and Guidelines for its implementation (New and Renewable Energy Department, Government of Madhya Pradesh)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ