Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Karnataka: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Karnataka
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Karnataka at a glance for solar projects
| Electricity regulator | Karnataka Electricity Regulatory Commission (KERC) |
|---|---|
| State renewable energy agency | Karnataka Renewable Energy Development Limited (KREDL) |
| Electricity distribution | BESCOM (Bengaluru (Bangalore Urban and Rural), Kolar, Chikkaballapura, Tumkur, Chitradurga, Davanagere and Ramanagara); MESCOM (Dakshina Kannada (Mangalore), Udupi, Shivamogga and Chikkamagalur); CESC (Mysore, Chamarajanagar, Mandya, Hassan and Kodagu (Madikeri)); HESCOM (Dharwad (Hubballi), Belagavi, Bagalkot, Vijayapur, Gadag, Haveri and Uttara Kannada); GESCOM (Kalaburagi (Gulbarga), Bidar, Yadgir, Raichur, Koppal, Ballari and Hospet in the north-east); HRECS (Hukeri taluk of Belagavi district) |
| State solar policy | Karnataka Renewable Energy Policy 2022-2027 (valid five years from gazette issue on 6 May 2022, or until a new policy is announced) |
| Rooftop metering for businesses | Net metering up to the sanctioned load or 1,000 kW, whichever is lower |
Net metering for a house in Karnataka
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Karnataka
In Karnataka, net metering is open to every consumer category, including commercial and industrial. The plant may be up to the sanctioned load or contract demand, or 1,000 kW, whichever is lower. The Distributed Solar PV (DSPV) Plants Regulations, 2026 set this. They were notified on 19 August 2026, published in the gazette on 24 August 2026, and replaced the 2016 rooftop regulations.
- Net billing and gross metering are also open to all categories, up to the sanctioned load or contract demand.
- Group net metering is open to all categories: 5 kW at least, and up to the combined sanctioned load of the connections taking part. They must have the same name and category.
- Virtual net metering is only for domestic, residential society, charitable, government and local-body consumers, not for commercial or industrial ones.
- A plant below 150 kW connects to the consumer's own distribution transformer. All solar plants on that transformer together may not exceed 80% of its rated capacity.
- The net metering rule and its limits stay in force until the total net, group and virtual net metered capacity in the state reaches 3 GW.
- Excess energy is bought at the PPA tariff. From 25 August 2026 to 30 June 2029 the generic tariff is ₹3.11 per unit for modules with domestic (DCR) cells and ₹2.34 per unit for other modules, for net metering of 1 kW to 1,000 kW (not domestic 1-10 kW), under a 25-year PPA.
What a rooftop system produces in Karnataka
Solar output changes across Karnataka with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,280 to 1,410 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Ballari | 1,390 | 1,400 |
| Belagavi | 1,370 | 1,400 |
| Bengaluru | 1,410 | 1,410 |
| Bidar | 1,370 | 1,400 |
| Davangere | 1,380 | 1,400 |
| Hosapete | 1,400 | 1,420 |
| Hubballi | 1,370 | 1,390 |
| Kalaburagi | 1,370 | 1,400 |
| Mangaluru | 1,280 | 1,300 |
| Mysuru | 1,370 | 1,380 |
| Raichur | 1,390 | 1,410 |
| Shivamogga | 1,350 | 1,360 |
| Tumkur | 1,400 | 1,410 |
| Vijayapura | 1,410 | 1,430 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Karnataka
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Karnataka.
Questions about solar projects in Karnataka
Is net metering available for factories and commercial buildings in Karnataka?
In Karnataka, net metering is open to every consumer category, including commercial and industrial. The plant may be up to the sanctioned load or contract demand, or 1,000 kW, whichever is lower. The Distributed Solar PV (DSPV) Plants Regulations, 2026 set this. They were notified on 19 August 2026, published in the gazette on 24 August 2026, and replaced the 2016 rooftop regulations.
How much solar subsidy can a house in Karnataka get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Karnataka?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Karnataka?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Karnataka
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026 (notification of 19 August 2026) and KERC generic tariff order of 25 August 2026
- KERC orders on Annual Performance Review for FY2024-25, 17 April 2026 (one for each licensee), and the About Us pages of the five distribution companies
- Karnataka Electricity Regulatory Commission
- Karnataka Renewable Energy Policy 2022-2027, Energy Department notification of 16 April 2022 (Karnataka Gazette, 6 May 2022)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ