Solar Subsidy in Gwalior: PM Surya Ghar Muft Bijli Yojana

This page sets out the solar subsidy available in Gwalior, Madhya Pradesh under PM Surya Ghar: Muft Bijli Yojana, the central scheme for rooftop solar on houses: what it pays, who qualifies, and how the application runs with the electricity supplier here. Somaya Solar Solutions Limited installs the systems and does the paperwork with you.

What the subsidy pays in Gwalior

PM Surya Ghar: Muft Bijli Yojana is the central government's scheme for rooftop solar on houses. It was launched on 13 February 2024 with an outlay of ₹75,021 crore, to put rooftop solar on one crore households and give them up to 300 units of free electricity a month. The subsidy covers 60% of the system cost up to 2 kW and 40% of the additional cost from 2 to 3 kW, and is capped at 3 kW.

System sizeCentral financial assistance (PM Surya Ghar)
Up to 2 kW₹30,000 per kW
Third kW (2 to 3 kW)₹18,000 per kW
3 kW and above₹78,000 in all (the cap)
Group housing society or RWA: common facilities, including EV charging₹18,000 per kW, up to 500 kW at 3 kW per house (the limit counts residents' own rooftop plants)

In practice that is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

No state top-up for Madhya Pradesh is recorded on this page. The state renewable energy agency (NRE) is the place to check for one.

Who can apply in Gwalior

The scheme is for residential consumers. The conditions that matter in practice:

  • A grid-connected residential electricity connection from the local distribution company, in the applicant's name
  • A roof with shadow-free space: about 10 sq m for each kW
  • Systems up to 3 kW draw the full per-kW subsidy; larger systems get the ₹78,000 cap
  • Group housing societies and RWAs qualify for common facilities up to 500 kW
  • A registered vendor must install the system, and the net metering agreement is signed through the portal
  • Collateral-free loans at 6% a year over 10 years are available from nationalised banks

How to apply for the solar subsidy in Gwalior

The scheme is demand-driven: any residential consumer with a grid connection from the local distribution company can apply on the National Portal (pmsuryaghar.gov.in). The process is online from registration to the subsidy reaching the consumer's bank account.

  1. Register on the National Portal with the electricity connection number and apply for the system size
  2. Approval from the electricity supplier (MPMKVVCL): technical feasibility is waived, and the sanctioned load is raised automatically up to 10 kW
  3. Choose a registered vendor and have the system installed
  4. Net metering: the agreement is part of the application, and the bidirectional meter is installed by the electricity supplier (MPMKVVCL)
  5. Commissioning report on the portal, then the subsidy is paid directly into the bank account
  6. Help line 15555 (12 languages); collateral-free loans at 6% a year over 10 years from nationalised banks

Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (MPMKVVCL) supplies electricity in Gwalior district, one of the districts it lists as its area.

In Gwalior the application for connection and metering goes to MPMKVVCL.

Subsidy by system size in Gwalior

The National Portal suggests the size from the monthly units on the bill. The output column is the PVGIS model for Gwalior (rooftop array at a 10° tilt, cautious loss settings); the roof column follows the rule of thumb UPNEDA gives, about 10 sq m for each kW.

SizeSuits a monthly use ofModelled output in GwaliorShadow-free roofCentral subsidy
1 kWup to 150 units1,400 units a year (about 117 a month)10 sq m₹30,000
2 kWup to 150 units, or 150 to 3002,800 units a year (about 233 a month)20 sq m₹60,000
3 kW150 to 300 units4,200 units a year (about 350 a month)30 sq m₹78,000
5 kWmore than 300 units7,000 units a year (about 583 a month)50 sq m₹78,000 (the cap)
10 kWmore than 300 units: a large house, or one with EV charging14,000 units a year (about 1,167 a month)100 sq m₹78,000 (the cap)

Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.

How far the scheme has reached

By August 2026 over 50 lakh households had benefited under the scheme, over 19 lakh of them reporting zero electricity bills, and over ₹28,000 crore of central assistance had been paid into consumers' bank accounts. The target is one crore households by 2026-27; in December 2025 the count stood at 23.96 lakh households.

What Somaya Solar does on a subsidised home system

The subsidy is paid by the central government to the house owner. Somaya Solar's part is the system and the paperwork.

  • Checking that the house, its connection and its roof qualify
  • Sizing the plant to the monthly units, so the subsidy and the bill saving both work
  • Registering the application and the vendor details on the National Portal with you
  • Supply and installation to the scheme's technical standards
  • Net metering, inspection and commissioning with the electricity supplier
  • Uploading the commissioning report so the subsidy can be released to your bank account

Somaya Solar as your installer in Gwalior

Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh, about 280 km from Gwalior in a straight line. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.

Based inGhaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area)
Installed50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW
Customers1,500+
Experience7+ years; presence in 6+ states
CertificationsISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor
StructuresHot-dip galvanised mounting structures made in our own works
ServiceMonitoring, cleaning and maintenance contracts after handover
Vendor registrationSomaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022).
Distance to Gwaliorabout 280 km in a straight line from our Ghaziabad works
  • Site survey and a written proposal that names the module, inverter and structure
  • Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
  • Subsidy application and net metering paperwork handled with you
  • Installation by our own teams on our own hot-dip galvanised structures
  • Service and cleaning contracts after handover

Questions about solar projects in Gwalior

Which electricity company handles solar connections in Gwalior?

Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (MPMKVVCL) supplies electricity in Gwalior district, one of the districts it lists as its area.

How much solar subsidy can a house in Gwalior get?

The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.

How much roof does a home solar system need in Gwalior?

About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.

How many units will a 3 kW system generate in Gwalior?

About 4,200 units a year, or about 350 a month on average, by the PVGIS model for Gwalior. Summer months give more, the monsoon less.

Does Somaya Solar handle the subsidy application and net metering?

Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.

Where is Somaya Solar based, and how far is that from Gwalior?

Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh, about 280 km from Gwalior in a straight line. The closest published project is KRIBHCO (2 MW rooftop plant) in Shahjahanpur, about 250 km away.

What does Somaya Solar need to prepare a proposal?

Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.

Discuss a solar project in Gwalior

Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.

Request a proposal

Email: info@somayasolar.com
Phone: +91-8700035846

Sources

Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.