Somaya Solar Solutions Limited, a Ghaziabad-based solar company, installs rooftop solar systems in Bihar: for houses under PM Surya Ghar, and for shops, offices, schools, hospitals and factories. One team does the survey, supply, installation, metering and handover.
Somaya Solar as your installer in Bihar
Somaya Solar Solutions Limited is based in Ghaziabad, Uttar Pradesh. The company states on its site over 50 MW installed, 1,500+ customers, 7+ years of work and presence in 6+ states, and holds ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates. See certifications and projects.
| Based in | Ghaziabad, Uttar Pradesh (C-159, Bulandshahr Road Industrial Area) |
|---|---|
| Installed | 50+ MW cumulative: rooftop and ground-mounted plants from house systems to multi-MW |
| Customers | 1,500+ |
| Experience | 7+ years; presence in 6+ states |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018; CII certified rooftop solar vendor |
| Structures | Hot-dip galvanised mounting structures made in our own works |
| Service | Monitoring, cleaning and maintenance contracts after handover |
| Vendor registration | Somaya Solar Solutions Limited is on UPNEDA's list of approved firms for rooftop solar in Uttar Pradesh (vendor code GZB2211050152, Ghaziabad, registered 9 November 2022). |
- Site survey and a written proposal that names the module, inverter and structure
- Grid-connected (on-grid) rooftop systems for houses, housing societies, shops, offices, schools, hospitals and factories
- Subsidy application and net metering paperwork handled with you
- Installation by our own teams on our own hot-dip galvanised structures
- Service and cleaning contracts after handover
How we install a rooftop solar system
A rooftop installation runs in the same order whether it is a 3 kW house system or a 500 kW factory roof; what changes is the paperwork and the structure.
- Site survey: roof type, shadow-free area, structural condition and the route for cables
- Study of twelve months of bills, to size the plant against your use and your sanctioned load
- Design and a fixed-price proposal that names the module, inverter and structure
- Application to the electricity supplier for connection and metering (on the National Portal for a subsidised house system)
- Supply, mounting, wiring, earthing and lightning protection
- Testing, meter installation and commissioning, then handover with warranties and monitoring access
Bihar at a glance for solar projects
| Electricity regulator | Bihar Electricity Regulatory Commission (BERC) |
|---|---|
| State renewable energy agency | Bihar Renewable Energy Development Agency (BREDA) |
| Electricity distribution | NBPDCL (All 21 districts of North Bihar: West Champaran, East Champaran, Sitamarhi, Sheohar, Muzaffarpur, Vaishali, Saran, Siwan, Gopalganj, Madhubani, Darbhanga, Samastipur, Begusarai, Khagaria, Saharsa, Supaul, Madhepura, Araria, Katihar, Purnia and Kishanganj); SBPDCL (17 districts of South Bihar, including Patna (the capital), Gaya, Bhagalpur, Munger, Aurangabad, Arrah, Biharsharif and Sasaram) |
| State solar policy | Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 (issued 10 July 2025; in force for five years or until a new policy replaces it) |
| Rooftop metering for businesses | Net or gross metering, up to the sanctioned load; draft change to a 500 kWp net metering cap is pending |
Net metering for a house in Bihar
A subsidised home system is grid-connected under net metering: the net metering agreement is part of the application on the National Portal, a bidirectional meter records what the house draws from the grid and what the roof sends back, and the bill is settled on the difference under the state regulator's rules.
Metering for shops, offices and factories in Bihar
In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.
- A consumer on net metering cannot also take gross metering. Neither arrangement allows banking.
- Under net metering the settlement period runs from 1 April to 31 March. Surplus energy left at the end of that period is neither paid for nor carried forward. Under gross metering the licensee pays the Feed-in Tariff approved by BERC for the year.
- Net metering is capped at 100 MW a year in each licensee's area. The total rooftop capacity on one distribution transformer may not exceed 80% of the transformer's capacity.
- The 2024 amendment says the licensee must finish the technical feasibility study within 15 days, or the proposal is treated as feasible. Applications up to 10 kW are deemed accepted without a study.
- The draft Second Amendment would cap net metering at 500 kWp or the sanctioned load, whichever is lower, allow gross metering up to the sanctioned load, and pay year-end surplus at 50% of the Feed-in Tariff. Comments were due by 28 October 2026 and the hearing was on 3 November 2026. Ask the licensee whether it has been notified.
- The state policy refers to virtual and group net metering but says only that they may be promoted with suitable regulations. The 2018 regulations do not mention them.
What a rooftop system produces in Bihar
Solar output changes across Bihar with latitude, haze and temperature. The table shows modelled yearly output for each kW installed, for a low-tilt rooftop array and for a ground-mounted array at the best fixed tilt. Across these places the figure runs from about 1,220 to 1,370 units per kW.
| Place | Rooftop, 10° tilt (kWh per kW a year) | Ground-mounted, best fixed tilt (kWh per kW a year) |
|---|---|---|
| Amarpur | 1,310 | 1,370 |
| Araria | 1,250 | 1,330 |
| Areraj | 1,340 | 1,420 |
| Arrah | 1,370 | 1,430 |
| Arwal | 1,370 | 1,440 |
| Aurangabad | 1,370 | 1,430 |
| Bagaha | 1,330 | 1,400 |
| Bahadurganj | 1,220 | 1,300 |
| Bairagnia | 1,330 | 1,410 |
| Bakhri | 1,320 | 1,390 |
| Bakhtiyarpur | 1,360 | 1,420 |
| Banka | 1,320 | 1,380 |
| Banmankhi Bazar | 1,280 | 1,350 |
| Barauli | 1,350 | 1,420 |
| Barauni | 1,350 | 1,420 |
| Barbigha | 1,360 | 1,430 |
| Barh | 1,360 | 1,420 |
| Barhiya | 1,330 | 1,400 |
| Begusarai | 1,340 | 1,410 |
| Belsand | 1,340 | 1,410 |
| Benipur | 1,320 | 1,390 |
| Bettiah | 1,340 | 1,420 |
| Bhabhua | 1,370 | 1,430 |
| Bhagalpur | 1,310 | 1,380 |
| Bihar Sharif | 1,360 | 1,430 |
| Bihariganj | 1,300 | 1,360 |
| Bihat | 1,340 | 1,410 |
| Bihta | 1,360 | 1,430 |
| Bikram | 1,370 | 1,440 |
| Bikramganj | 1,370 | 1,440 |
| Bodh Gaya | 1,360 | 1,430 |
| Buxar | 1,370 | 1,440 |
| Chakia | 1,340 | 1,410 |
| Chanpatia | 1,340 | 1,420 |
| Chapra | 1,360 | 1,430 |
| Colgong | 1,290 | 1,360 |
| Dalsingh Sarai | 1,340 | 1,410 |
| Darbhanga | 1,330 | 1,400 |
| Daudnagar | 1,370 | 1,440 |
| Dhaka | 1,340 | 1,420 |
| Dighwara | 1,360 | 1,430 |
| Dinapur Cantonment | 1,360 | 1,430 |
| Dinapur Nizamat | 1,360 | 1,430 |
| Dumraon | 1,370 | 1,440 |
| Fatwa | 1,350 | 1,420 |
| Forbesganj | 1,250 | 1,330 |
| Gaya | 1,360 | 1,430 |
| Gogri Jamalpur | 1,320 | 1,380 |
| Gopalganj | 1,350 | 1,430 |
| Hajipur | 1,360 | 1,430 |
| Hilsa | 1,360 | 1,430 |
| Hisua | 1,360 | 1,420 |
| Islampur | 1,370 | 1,430 |
| Jagdispur | 1,370 | 1,440 |
| Jahanabad | 1,370 | 1,440 |
| Jainagar | 1,290 | 1,370 |
| Jamalpur | 1,330 | 1,390 |
| Jamui | 1,350 | 1,410 |
| Jhajha | 1,340 | 1,410 |
| Jhanjharpur | 1,300 | 1,370 |
| Jogbani | 1,250 | 1,330 |
| Kasba | 1,260 | 1,330 |
| Kataiya | 1,360 | 1,430 |
| Katihar | 1,260 | 1,330 |
| Khagaria | 1,320 | 1,390 |
| Khagaul | 1,360 | 1,420 |
| Kharagpur | 1,320 | 1,380 |
| Kishanganj | 1,240 | 1,310 |
| Koelwar | 1,360 | 1,430 |
| Lalganj | 1,350 | 1,420 |
| Luckeesarai | 1,350 | 1,410 |
| Madhepura | 1,290 | 1,360 |
| Madhubani | 1,310 | 1,380 |
| Maharajgani | 1,360 | 1,430 |
| Mahnar Bazar | 1,350 | 1,420 |
| Mairwa | 1,370 | 1,440 |
| Makhdumpur | 1,370 | 1,430 |
| Maner | 1,370 | 1,430 |
| Manihari | 1,270 | 1,340 |
| Marhaura | 1,360 | 1,430 |
| Masaurhi Buzurg | 1,360 | 1,430 |
| Mehsi | 1,340 | 1,410 |
| Mokameh | 1,350 | 1,410 |
| Mothihari | 1,340 | 1,420 |
| Motipur | 1,340 | 1,410 |
| Munger | 1,330 | 1,390 |
| Murliganj | 1,290 | 1,360 |
| Muzaffarpur | 1,340 | 1,410 |
| Nabinagar | 1,370 | 1,430 |
| Narkatiaganj | 1,320 | 1,400 |
| Nasriganj | 1,370 | 1,440 |
| Naubatpur | 1,370 | 1,440 |
| Naugachhia | 1,290 | 1,360 |
| Nawada | 1,360 | 1,420 |
| Nirmali | 1,280 | 1,350 |
| Nokha | 1,370 | 1,440 |
| Pakridayal | 1,340 | 1,420 |
| Patna | 1,360 | 1,420 |
| Phulwari Sharif | 1,360 | 1,420 |
| Piro | 1,370 | 1,440 |
| Purnia | 1,270 | 1,340 |
| Rafiganj | 1,370 | 1,430 |
| Rajauli | 1,360 | 1,430 |
| Rajgir | 1,370 | 1,430 |
| Ramnagar | 1,320 | 1,400 |
| Raxaul | 1,340 | 1,420 |
| Revelganj | 1,360 | 1,430 |
| Rosera | 1,320 | 1,390 |
| Saharsa | 1,300 | 1,370 |
| Sahibganj | 1,340 | 1,420 |
| Samastipur | 1,330 | 1,400 |
| Sasaram | 1,370 | 1,440 |
| Sheikhpura | 1,350 | 1,410 |
| Sheohar | 1,340 | 1,410 |
| Sherghati | 1,370 | 1,430 |
| Silao | 1,370 | 1,430 |
| Sitamarhi | 1,340 | 1,410 |
| Siwan | 1,360 | 1,440 |
| Sonepur | 1,360 | 1,430 |
| Sultanganj | 1,320 | 1,390 |
| Supaul | 1,300 | 1,370 |
| Teghra | 1,350 | 1,420 |
| Tekari | 1,370 | 1,440 |
| Waris Aliganj | 1,360 | 1,420 |
Output figures are modelled with the European Commission's PVGIS tool (ERA5 weather data, 2005 to 2023) with system losses set at 20%, which is on the cautious side. Real output depends on shading, dust, equipment and layout. A site study gives the figure to plan on.
Subsidy for houses in Bihar
Under PM Surya Ghar: Muft Bijli Yojana the central government pays ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger. The full table, the conditions and the application steps are on Solar subsidy in Bihar.
Questions about solar projects in Bihar
Is net metering available for factories and commercial buildings in Bihar?
In Bihar, any eligible consumer of NBPDCL or SBPDCL, including commercial and industrial consumers, can install rooftop solar under net metering or gross metering. The system must be at least 1 kWp and may not exceed the consumer's sanctioned or contracted load. The rules are in BERC's Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering Regulations, 2018, as amended on 24 July 2024. On 8 October 2026 BERC published a draft Second Amendment for comment. It was not final when we checked.
How much solar subsidy can a house in Bihar get?
The central subsidy under PM Surya Ghar is ₹30,000 for a 1 kW system, ₹60,000 for 2 kW and ₹78,000 for 3 kW or larger.
How much roof does a home solar system need in Bihar?
About 10 sq m of shadow-free roof for each kW: a 3 kW system needs about 30 sq m (roughly 320 sq ft). Sheet and concrete roofs both work; the structure is designed for the roof.
Does Somaya Solar handle the subsidy application and net metering?
Yes. The application on the National Portal, the vendor details, the net metering agreement and the commissioning report are done with you; the subsidy is paid by the government into your bank account.
How long does a rooftop solar installation take in Bihar?
The work on the roof is usually a matter of days. The time before it goes on the survey, the proposal and the supplier's approval; the time after it on the meter and the commissioning inspection. The proposal carries a dated schedule.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Bihar
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 25 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2018, consolidated text with the 1st Amendment of 24 July 2024 (BERC Compendium of Regulations Vol-II); BERC public notice No. 12 of 8 October 2026 with the draft Second Amendment
- Bihar Electricity Regulatory Commission
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025 (Energy Department, Government of Bihar), section 5: BREDA is the State Nodal Agency
- Bihar Policy for Promotion of Bihar New and Renewable Energy Sources 2025, Energy Department, Government of Bihar (scanned PDF); MNRE Policy & Regulatory Updates, July 2025, item V.1, gives the date 10 July 2025
- Government of NCT of Delhi, Energy Efficiency and Renewable Energy Management Centre: PM Surya Ghar central subsidy (page updated 25 November 2026)
- NBPDCL website, About Us (names its 21 districts); SBPDCL website, About Us (17 districts of South Bihar) and Phone Directory (divisional control rooms)
- PVGIS, European Commission Joint Research Centre (solar output model)
- Press Information Bureau: PM Surya Ghar reaches 23.96 lakh households, written reply in Rajya Sabha (8 December 2025)
- UPNEDA Solar Rooftop Portal: Approved Firms
- UPNEDA Solar Rooftop Portal: FAQ