Somaya Solar Solutions Limited takes up megawatt-scale, grid-connected solar plants in Andaman and Nicobar Islands as an EPC contractor: engineering, supply, construction and commissioning.
What Andaman and Nicobar Islands's policy says about large solar plants
We could not find a current Andaman and Nicobar Islands solar or renewable energy policy as of November 2026. The Electricity Department website (vidyut.andamannicobar.gov.in) lists none, and its April 2025 rooftop solar FAQ cites none. Rooftop net metering follows the Joint Electricity Regulatory Commission's 2019 net metering regulations, which extend to the islands. National schemes (PM Surya Ghar for homes, PM-KUSUM for farmers) apply.
- The 2019 regulations were amended in 2024.
JERC brought green energy open access into its Connectivity and Open Access Regulations, 2017 through the Third Amendment of 2024, published in the Gazette of India on 19 September 2024, and the amendment extends to the Andaman and Nicobar Islands. A consumer with a contract demand or sanctioned load of 100 kW or more can take renewable power through open access. In its tariff order of 28 October 2025 the Commission said that, because of practical constraints, open access is not an option for consumers in the islands.
- Captive consumers have no load limit.
- Banking is allowed within the month or billing cycle, up to 30% of the consumer's monthly consumption from the licensee. The banking charge is 8% of the banked energy, taken in units. Banked energy cannot be carried to the next month; unused energy lapses and the generator gets renewable energy certificates for it.
- Neither the cross-subsidy surcharge nor the additional surcharge applies to captive use.
- The additional surcharge is not charged on green energy open access up to the contract demand if the consumer pays fixed charges to the licensee for it.
- Standby charges for a green energy open access consumer may not be more than 25% of the energy charge of the consumer's tariff category.
What utility-scale work involves
At megawatt scale the grid connection, land and delivery schedule decide the project as much as the equipment does.
- Land and grid-connection feasibility
- Detailed engineering for the plant and the evacuation system
- Procurement and logistics for modules, inverters, transformers and structures
- Civil, mechanical and electrical construction with several teams working in parallel
- Testing, commissioning and connection with the transmission or distribution utility
- Operation and maintenance, where contracted
More detail: Utility-Scale Solar across India.
Questions about solar projects in Andaman and Nicobar Islands
How much land does a solar plant need?
A fixed-tilt ground-mounted plant typically needs about 4 to 5 acres for each MW. The exact area depends on the module, the tilt and the shape of the plot.
Where is Somaya Solar based?
Somaya Solar Solutions Limited works from C-159, Bulandshahr Road Industrial Area, Ghaziabad, Uttar Pradesh.
What does Somaya Solar need to prepare a proposal?
Twelve months of electricity bills, the sanctioned load or contract demand, the roof or land details with photographs, and the plant size you have in mind if you have one.
Discuss a solar project in Andaman and Nicobar Islands
Send your electricity bills, sanctioned load and roof or land details, and we will reply with a first assessment.
Email: info@somayasolar.com
Phone: +91-8700035846
Sources
Local rules and figures on this page were last checked on 19 November 2026. Rules and tariffs change; confirm the current position before you commit to a project.
- Electricity Department, A&N Administration (site and FAQ for rooftop solar); JERC Net Metering Regulations, 2019
- JERC (Connectivity and Open Access in Intra-State Transmission and Distribution) (Third Amendment) Regulations, 2024 (No. JERC-21/2017, notified 13 August 2024, Gazette of India 19 September 2024), and JERC Tariff Order for the Electricity Department, Andaman & Nicobar Administration of 28 October 2025